IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0872 # 08 Y:2010 08 2010 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $63,868 $350,000 Implemented
GT0872 # 05 Y:2010 05 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,328 $20,000 Implemented
GT0872 # 04 Y:2010 04 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $487 $150,000 Implemented
GT0872 # 02 Y:2010 02 2010 USE SYNTHETIC LUBRICANT $9,230 $0 Implemented
GT0872 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $960 $1,300 Implemented
GT0832 # 09 Y:2006 09 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,862 $47,168 Implemented
GT0832 # 07 Y:2006 07 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $43,862 $20,449 Implemented
GT0832 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,105 $0 Implemented
GT0832 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,559 $45,000 Implemented
GT0832 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,160 $1,250 Implemented
GT0605 # 06 Y:1996 06 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,120 $4,300 Implemented
GT0605 # 09 Y:1996 09 1996 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $260,000 $49,800 Implemented
GT0605 # 07 Y:1996 07 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,000 $4,908 Implemented
GT0605 # 05 Y:1996 05 1996 METER WASTE WATER $14,720 $0 Implemented
GT0605 # 04 Y:1996 04 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,090 $1,450 Implemented
GT0605 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $3,308 $103 Implemented
GT0605 # 02 Y:1996 02 1996 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,110 $3,500 Implemented
GT0605 # 01 Y:1996 01 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,246 $675 Implemented
UF0165 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,841 $1,350 Implemented
UF0165 # 04 Y:1996 04 1996 CLEAN CONDENSER TUBES $19,869 $0 Implemented
GT0578 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,090 $34,520 Implemented
GT0578 # 04 Y:1996 04 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $3,970 $500 Implemented
GT0578 # 03 Y:1996 03 1996 INCREASE AMOUNT OF CONDENSATE RETURNED $27,914 $12,000 Implemented
GT0578 # 02 Y:1996 02 1996 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $2,045 $1,000 Implemented
GT0578 # 01 Y:1996 01 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $21,137 $50,000 Implemented