IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0788 # 06 Y:2018 06 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $3,493 $1,750 Implemented
MA0788 # 05 Y:2018 05 2018 INSULATE BARE EQUIPMENT $4,116 $10,462 Implemented
MA0788 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,627 $17,006 Implemented
MA0788 # 01 Y:2018 01 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $98,644 $110,000 Implemented
MA0712 # 01 Y:2013 01 2013 USE RADIANT HEATER FOR SPOT HEATING $13,420 $65,327 Implemented
MA0712 # 02 Y:2013 02 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,863 $12,000 Implemented
MA0712 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,311 $5,000 Implemented
MA0712 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $827 $1,200 Implemented
MA0712 # 08 Y:2013 08 2013 INSULATE BARE EQUIPMENT $323 $750 Implemented
MA0468 # 03 Y:2000 03 2000 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $390 $440 Implemented
MA0468 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $304 $474 Implemented
MA0468 # 01 Y:2000 01 2000 USE OTHER METHODS FOR NEUTRALIZATION $28,530 $100,000 Implemented
MA0103 # 01 Y:1987 01 1987 REPAIR AND ELIMINATE STEAM LEAKS $25,545 $1,275 Implemented
MA0103 # 05 Y:1987 05 1987 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $470 $0 Implemented
MA0103 # 06 Y:1987 06 1987 INSTALL / REPAIR INSULATION ON STEAM LINES $5,019 $15,000 Implemented
MA0048 # 02 Y:1985 02 1985 INSTALL TURBULATORS $636 $2,200 Implemented
MA0048 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $592 $180 Implemented