IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 2032 Canned Specialties
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0491 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $310 $200 Implemented
LM0117 # 06 Y:2006 06 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $2,061 $500 Implemented
LM0117 # 04 Y:2006 04 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,788 $3,000 Implemented
LM0117 # 02 Y:2006 02 2006 INSTALL BACK-UP EQUIPMENT $86,200 $105,000 Implemented
LM0117 # 01 Y:2006 01 2006 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $125,343 $20,000 Implemented
LM0078 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN WATER LINES AND VALVES $5,717 $400 Implemented
LM0078 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,800 $1,220 Implemented
LM0078 # 11 Y:2004 11 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $69,741 $2,000 Implemented
LM0078 # 10 Y:2004 10 2004 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $298,998 $56,840 Implemented
LM0078 # 08 Y:2004 08 2004 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $150,678 $1,000 Implemented
LM0078 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $238 $142 Implemented
LM0078 # 04 Y:2004 04 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $5,504 $1,585 Implemented
LM0078 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $4,064 $264 Implemented
SF0283 # 10 Y:2004 10 2004 USE AN AUTOMATIC PLATE PROCESSOR $27,300 $40,500 Implemented
SF0283 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $1,066 $2,688 Implemented
SF0283 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,669 $10,828 Implemented
SF0283 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $1,284 $1,218 Implemented
SF0283 # 05 Y:2004 05 2004 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $61,990 $40,000 Implemented
SF0283 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $33,377 $31,490 Implemented
SF0283 # 03 Y:2004 03 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,636 $829 Implemented
SF0283 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,759 $0 Implemented
SF0189 # 07 Y:2000 07 2000 MINIMIZE WATER USAGE $23,452 $125,000 Implemented
SF0189 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,102 $36,670 Implemented
SF0189 # 05 Y:2000 05 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $8,916 $14,480 Implemented
SF0189 # 04 Y:2000 04 2000 INSTALL OCCUPANCY SENSORS $1,491 $2,520 Implemented