IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

435

matching recommendations
Reset
SIC 2033 Canned Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0384 # 07 Y:2010 07 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $8,056 $11,016 Implemented
SF0384 # 06 Y:2010 06 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,925 $4,309 Implemented
SF0384 # 05 Y:2010 05 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $94 $48 Implemented
SF0384 # 04 Y:2010 04 2010 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $70,630 $14,698 Implemented
SF0384 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $450 $0 Implemented
SF0384 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $806 $0 Implemented
SF0384 # 01 Y:2010 01 2010 REPAIR AND ELIMINATE STEAM LEAKS $65,311 $0 Implemented
TT0038 # 02 Y:2009 02 2009 REPAIR AND ELIMINATE STEAM LEAKS $21,918 $10,000 Implemented
TT0038 # 05 Y:2009 05 2009 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,893 $0 Implemented
TT0038 # 07 Y:2009 07 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,036 $1,600 Implemented
TT0038 # 08 Y:2009 08 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,000 $4,900 Implemented
SD0389 # 02 Y:2006 02 2006 USE PHOTOCELL CONTROLS $846 $480 Implemented
SD0389 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $433 $2,797 Implemented
SD0389 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $264 $1,006 Implemented
OR0510 # 01 Y:2006 01 2006 CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT $61,000 $40,000 Implemented
OR0510 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,200 $35,000 Implemented
OR0510 # 07 Y:2006 07 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,900 $19,200 Implemented
OR0503 # 01 Y:2006 01 2006 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $37,500 $42,500 Implemented
OR0503 # 03 Y:2006 03 2006 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $17,800 $36,000 Implemented
OR0503 # 04 Y:2006 04 2006 $50,800 $11,300 Implemented
OR0503 # 05 Y:2006 05 2006 MAXIMIZE PRODUCTION RUNS TO REDUCE CLEANING $46,500 $0 Implemented
OR0503 # 06 Y:2006 06 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $5,341 $600 Implemented
SF0335 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $60,485 $21,245 Implemented
SF0335 # 01 Y:2006 01 2006 REPAIR AND ELIMINATE STEAM LEAKS $284 $0 Implemented
SF0335 # 03 Y:2006 03 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $3,339 $1,175 Implemented