IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

134

matching recommendations
Reset
SIC 2033 Canned Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0582 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,960 $0 Implemented
SF0582 # 03 Y:2022 03 2022 INSTALL / REPAIR INSULATION ON STEAM LINES $29,881 $2,290 Implemented
SF0582 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,094 $17,764 Implemented
SF0582 # 04 Y:2022 04 2022 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $10,294 $2,290 Implemented
SF0582 # 09 Y:2022 09 2022 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $3,070 $11,782 Implemented
SF0582 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,257 $45,587 Implemented
SF0582 # 02 Y:2022 02 2022 MODIFY STARTUP/SHUTDOWN TIMES $7,144 $0 Implemented
SF0582 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,836 $41,117 Implemented
SF0486 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,334 $11,830 Implemented
SF0486 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $833 $0 Implemented
SF0486 # 04 Y:2016 04 2016 UPGRADE CONTROLS ON COMPRESSORS $60,071 $20,763 Implemented
SF0486 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $15,444 $46,053 Implemented
SF0486 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,280 $0 Implemented
SF0423 # 04 Y:2012 04 2012 REPAIR OR REPLACE STEAM TRAPS $5,375 $3,925 Implemented
SF0423 # 09 Y:2012 09 2012 INSULATE BARE EQUIPMENT $2,993 $7,655 Implemented
SF0423 # 08 Y:2012 08 2012 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $406 $1,040 Implemented
SF0423 # 01 Y:2012 01 2012 CLOSE OFF UNNEEDED STEAM LINES $417 $0 Implemented
SF0423 # 12 Y:2012 12 2012 RECOVER AND REUSE COOLING WATER $4,700 $700 Implemented
SF0423 # 02 Y:2012 02 2012 REPAIR AND ELIMINATE STEAM LEAKS $4,512 $0 Implemented
SF0423 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $14,919 $21,094 Implemented
SF0423 # 03 Y:2012 03 2012 INSTALL SET-BACK TIMERS $3,656 $0 Implemented
SF0423 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $4,091 $4,108 Implemented
SF0423 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,535 $127,175 Implemented
SF0405 # 03 Y:2012 03 2012 INCREASE AMOUNT OF CONDENSATE RETURNED $139,563 $85,532 Implemented
SF0405 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,795 $1,200 Implemented