IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
SIC 2033 Canned Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0653 # 01 Y:2015 01 2015 INCREASE AMOUNT OF CONDENSATE RETURNED $118,419 $40,792 Not Implemented
OR0653 # 04 Y:2015 04 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $611 $1,058 Not Implemented
OR0653 # 02 Y:2015 02 2015 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $36,536 $30,728 Not Implemented
OR0653 # 03 Y:2015 03 2015 USE OPTIMUM THICKNESS INSULATION $3,897 $4,580 Not Implemented
OR0653 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,625 $1,000 Not Implemented
OR0653 # 05 Y:2015 05 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,262 $15,398 Not Implemented
OR0503 # 01 Y:2006 01 2006 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $37,500 $42,500 Implemented
OR0503 # 05 Y:2006 05 2006 MAXIMIZE PRODUCTION RUNS TO REDUCE CLEANING $46,500 $0 Implemented
OR0503 # 02 Y:2006 02 2006 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $23,480 $24,300 Not Implemented
OR0503 # 04 Y:2006 04 2006 $50,800 $11,300 Implemented
OR0503 # 03 Y:2006 03 2006 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $17,800 $36,000 Implemented
OR0503 # 06 Y:2006 06 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $5,341 $600 Implemented
OR0503 # 07 Y:2006 07 2006 OPTIMIZE PLANT POWER FACTOR $4,700 $18,300 Not Implemented
OR0382 # 06 Y:2000 06 2000 ELIMINATE A BY-PRODUCT $68,235 $2,000 Implemented
OR0382 # 01 Y:2000 01 2000 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $26,817 $900 Implemented
OR0382 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,194 $2,979 Not Implemented
OR0382 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,208 $26,491 Implemented
OR0382 # 05 Y:2000 05 2000 OPTIMIZE PLANT POWER FACTOR $2,241 $6,400 Not Implemented
OR0382 # 04 Y:2000 04 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,050 $4,653 Not Implemented
OR0381 # 04 Y:2000 04 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,850 $8,600 Implemented
OR0381 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $540 $345 Not Implemented
OR0381 # 05 Y:2000 05 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,096 $390 Implemented
OR0381 # 06 Y:2000 06 2000 $20,970 $40,500 Not Implemented
OR0381 # 01 Y:2000 01 2000 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM $27,260 $0 Implemented
OR0381 # 02 Y:2000 02 2000 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $699 $300 Implemented