Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
88
matching recommendationsSIC | 2033 | Canned Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0653 # 06 Y:2015 | 06 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,625 | $1,000 | Not Implemented |
OR0653 # 05 Y:2015 | 05 | 2015 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,262 | $15,398 | Not Implemented |
OR0653 # 04 Y:2015 | 04 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $611 | $1,058 | Not Implemented |
OR0653 # 03 Y:2015 | 03 | 2015 | USE OPTIMUM THICKNESS INSULATION | $3,897 | $4,580 | Not Implemented |
OR0653 # 02 Y:2015 | 02 | 2015 | FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | $36,536 | $30,728 | Not Implemented |
OR0653 # 01 Y:2015 | 01 | 2015 | INCREASE AMOUNT OF CONDENSATE RETURNED | $118,419 | $40,792 | Not Implemented |
OR0503 # 02 Y:2006 | 02 | 2006 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $23,480 | $24,300 | Not Implemented |
OR0503 # 01 Y:2006 | 01 | 2006 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $37,500 | $42,500 | Implemented |
OR0503 # 03 Y:2006 | 03 | 2006 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $17,800 | $36,000 | Implemented |
OR0503 # 04 Y:2006 | 04 | 2006 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $50,800 | $11,300 | Implemented |
OR0503 # 05 Y:2006 | 05 | 2006 | MAXIMIZE PRODUCTION RUNS TO REDUCE CLEANING | $46,500 | $0 | Implemented |
OR0503 # 06 Y:2006 | 06 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,341 | $600 | Implemented |
OR0503 # 07 Y:2006 | 07 | 2006 | OPTIMIZE PLANT POWER FACTOR | $4,700 | $18,300 | Not Implemented |
OR0382 # 06 Y:2000 | 06 | 2000 | ELIMINATE A BY-PRODUCT | $68,235 | $2,000 | Implemented |
OR0382 # 05 Y:2000 | 05 | 2000 | OPTIMIZE PLANT POWER FACTOR | $2,241 | $6,400 | Not Implemented |
OR0382 # 04 Y:2000 | 04 | 2000 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,050 | $4,653 | Not Implemented |
OR0382 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,194 | $2,979 | Not Implemented |
OR0382 # 02 Y:2000 | 02 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $15,208 | $26,491 | Implemented |
OR0382 # 01 Y:2000 | 01 | 2000 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $26,817 | $900 | Implemented |
OR0381 # 04 Y:2000 | 04 | 2000 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,850 | $8,600 | Implemented |
OR0381 # 01 Y:2000 | 01 | 2000 | IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM | $27,260 | $0 | Implemented |
OR0381 # 02 Y:2000 | 02 | 2000 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $699 | $300 | Implemented |
OR0381 # 03 Y:2000 | 03 | 2000 | INSULATE BARE EQUIPMENT | $540 | $345 | Not Implemented |
OR0381 # 05 Y:2000 | 05 | 2000 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $1,096 | $390 | Implemented |
OR0381 # 06 Y:2000 | 06 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $20,970 | $40,500 | Not Implemented |