IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
Reset
SIC 2034 Dehydrated Fruits, Vegetables, Soups
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0303 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $858 $486 Implemented
UF0400 # 05 Y:2007 05 2007 KEEP EQUIPMENT CLEAN $3,059 $87 Implemented
UF0400 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $4,182 $928 Implemented
UF0400 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,632 $9,727 Implemented
UF0400 # 03 Y:2007 03 2007 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,930 $624 Implemented
OR0508 # 08 Y:2006 08 2006 UPGRADE CONTROLS ON COMPRESSORS $5,100 $30,000 Implemented
OR0508 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,100 $12,000 Implemented
OR0508 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,200 $3,200 Implemented
OR0508 # 03 Y:2006 03 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $24,700 $5,000 Implemented
OR0508 # 02 Y:2006 02 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $53,000 $2,000 Implemented
OR0508 # 01 Y:2006 01 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $69,500 $30,000 Implemented
SF0314 # 09 Y:2005 09 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,342 $4,848 Implemented
SF0314 # 02 Y:2005 02 2005 REPAIR AND ELIMINATE STEAM LEAKS $6,788 $0 Implemented
SF0314 # 01 Y:2005 01 2005 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $4,353 $0 Implemented
SF0314 # 08 Y:2005 08 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,436 $5,848 Implemented
SF0314 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $258 $0 Implemented
SU0148 # 02 Y:2002 02 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $25,533 $0 Implemented
SU0148 # 04 Y:2002 04 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $31,584 $17,490 Implemented
SU0148 # 03 Y:2002 03 2002 MODIFY WORKLOAD $14,400 $20,000 Implemented
SU0148 # 05 Y:2002 05 2002 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $9,006 $3,700 Implemented
SU0148 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $70 $60 Implemented
SU0148 # 07 Y:2002 07 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $105 $0 Implemented
OR0377 # 04 Y:2000 04 2000 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $108,000 $40,000 Implemented
NV0090 # 02 Y:1997 02 1997 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $124 $0 Implemented
NV0090 # 01 Y:1997 01 1997 INSULATE BARE EQUIPMENT $9,086 $58,500 Implemented