Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
233
matching recommendationsSIC | 2035 | Pickles, Sauces, And Salad Dressings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0066 # 01 Y:2022 | 01 | 2022 | USE AUTOMATIC CLEANING EQUIPMENT | $250,000 | $215,120 | Implemented |
NL0066 # 05 Y:2022 | 05 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $11,640 | $13,920 | Implemented |
NL0066 # 03 Y:2022 | 03 | 2022 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $49,500 | $95,000 | Implemented |
NL0066 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,513 | $7,203 | Implemented |
NL0066 # 04 Y:2022 | 04 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $16,645 | $32,028 | Implemented |
LS2219 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $389 | $225 | Implemented |
LS2219 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $676 | $1,121 | Implemented |
SF0549 # 08 Y:2020 | 08 | 2020 | USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING | $22,925 | $1,810 | Implemented |
SF0549 # 06 Y:2020 | 06 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $403 | $1,776 | Implemented |
SF0549 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,719 | $0 | Implemented |
SF0549 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $475 | $1,214 | Implemented |
SF0549 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,204 | $25,635 | Implemented |
NC0598 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $932 | $100 | Implemented |
NC0598 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,448 | $18,822 | Implemented |
NC0598 # 02 Y:2017 | 02 | 2017 | INSTALL OCCUPANCY SENSORS | $165 | $547 | Implemented |
TT0125 # 01 Y:2014 | 01 | 2014 | REPAIR AND ELIMINATE STEAM LEAKS | $11,367 | $1,500 | Implemented |
MA0712 # 07 Y:2013 | 07 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $827 | $1,200 | Implemented |
MA0712 # 08 Y:2013 | 08 | 2013 | INSULATE BARE EQUIPMENT | $323 | $750 | Implemented |
MA0712 # 01 Y:2013 | 01 | 2013 | USE RADIANT HEATER FOR SPOT HEATING | $13,420 | $65,327 | Implemented |
MA0712 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,311 | $5,000 | Implemented |
MA0712 # 02 Y:2013 | 02 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,863 | $12,000 | Implemented |
BS0016 # 04 Y:2013 | 04 | 2013 | COVER OPEN TANKS | $4,197 | $1,600 | Implemented |
BS0016 # 03 Y:2013 | 03 | 2013 | INSULATE BARE EQUIPMENT | $437 | $604 | Implemented |
BS0016 # 02 Y:2013 | 02 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $571 | $184 | Implemented |
BS0016 # 01 Y:2013 | 01 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $15,856 | $27,630 | Implemented |