IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

421

matching recommendations
Reset
SIC 2035 Pickles, Sauces, And Salad Dressings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0328 # 02 Y:2005 02 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,992 $0 Not Implemented
WV0328 # 03 Y:2005 03 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,942 $18,000 Implemented
WV0328 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,040 $60 Implemented
WV0328 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $948 $0 Implemented
WV0328 # 06 Y:2005 06 2005 USE SYNTHETIC LUBRICANT $649 $30 Not Implemented
WV0328 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $646 $278 Implemented
WV0328 # 08 Y:2005 08 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $406 $430 Not Implemented
WV0328 # 09 Y:2005 09 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $397 $120 Implemented
WV0328 # 10 Y:2005 10 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $282 $1,530 Implemented
IA0359 # 01 Y:2005 01 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $15,800 $6,352 Not Implemented
IA0359 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $774 $76 Implemented
IA0359 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,024 $790 Implemented
IA0359 # 04 Y:2005 04 2005 UPGRADE CONTROLS ON COMPRESSORS $3,593 $500 Not Implemented
IA0359 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $518 $30,000 Implemented
IA0359 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $299 $504 Implemented
IA0359 # 07 Y:2005 07 2005 ADJUST BURNERS FOR EFFICIENT OPERATION $1,436 $1,000 Implemented
IA0359 # 08 Y:2005 08 2005 $3,866 $1,223 Not Implemented
OR0475 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,030 $6,920 Not Implemented
OR0475 # 02 Y:2005 02 2005 AVOID FROST FORMATION ON EVAPORATORS $6,600 $1,500 Implemented
OR0475 # 03 Y:2005 03 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,300 $0 Not Implemented
OR0475 # 04 Y:2005 04 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $9,700 $0 Not Implemented
OR0475 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $920 $0 Not Implemented
OR0475 # 06 Y:2005 06 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,920 $0 Implemented
IA0355 # 01 Y:2004 01 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,113 $300 Implemented
IA0355 # 02 Y:2004 02 2004 USE MINIMUM STEAM OPERATING PRESSURE $965 $25 Not Implemented