Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
309
matching recommendationsSIC | 2037 | Frozen Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0210 # 06 Y:2011 | 06 | 2011 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $18,125 | $133,000 | Implemented |
MI0210 # 11 Y:2011 | 11 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,145 | $8,889 | Implemented |
MI0210 # 10 Y:2011 | 10 | 2011 | USE RADIANT HEATER FOR SPOT HEATING | $8,346 | $10,000 | Implemented |
OR0565 # 06 Y:2011 | 06 | 2011 | HEAT WATER WITH EXHAUST HEAT | $77,370 | $96,750 | Implemented |
OR0565 # 05 Y:2011 | 05 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,900 | $10,900 | Implemented |
OR0565 # 03 Y:2011 | 03 | 2011 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $10,300 | $17,700 | Implemented |
OR0565 # 02 Y:2011 | 02 | 2011 | INSULATE BARE EQUIPMENT | $6,110 | $21,715 | Implemented |
OR0565 # 01 Y:2011 | 01 | 2011 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $14,900 | $9,340 | Implemented |
OR0561 # 07 Y:2010 | 07 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,321 | $3,321 | Implemented |
OR0561 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,786 | $10,046 | Implemented |
OR0561 # 05 Y:2010 | 05 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $90,831 | $106,316 | Implemented |
OR0561 # 01 Y:2010 | 01 | 2010 | ISOLATE HOT OR COLD EQUIPMENT | $7,124 | $1,529 | Implemented |
OR0561 # 02 Y:2010 | 02 | 2010 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $84,544 | $24,245 | Implemented |
OR0561 # 03 Y:2010 | 03 | 2010 | UPGRADE CONTROLS ON COMPRESSORS | $14,426 | $7,234 | Implemented |
OR0561 # 04 Y:2010 | 04 | 2010 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $18,820 | $19,635 | Implemented |
OR0558 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,102 | $7,102 | Implemented |
OR0558 # 03 Y:2010 | 03 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,319 | $4,935 | Implemented |
OR0558 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $14,738 | $120,911 | Implemented |
OR0558 # 01 Y:2010 | 01 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $6,602 | $2,965 | Implemented |
SF0374 # 08 Y:2009 | 08 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $48,237 | $33,968 | Implemented |
SF0374 # 07 Y:2009 | 07 | 2009 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $17,939 | $12,500 | Implemented |
SF0374 # 06 Y:2009 | 06 | 2009 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $15,888 | $9,574 | Implemented |
SF0374 # 03 Y:2009 | 03 | 2009 | REDUCE EXCESSIVE BOILER BLOWDOWN | $10,627 | $2,372 | Implemented |
SF0374 # 02 Y:2009 | 02 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,699 | $0 | Implemented |
SF0374 # 05 Y:2009 | 05 | 2009 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $5,402 | $3,037 | Implemented |