IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

185

matching recommendations
Reset
SIC 2037 Frozen Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0780 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $1,666 $24,285 n/a
OR0780 # 03 Y:2023 03 2023 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $2,453 $14,157 n/a
OR0780 # 01 Y:2023 01 2023 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $35,316 $540,000 n/a
OR0780 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,517 $4,115 n/a
OR0775 # 01 Y:2023 01 2023 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $174,406 $233,000 n/a
OR0775 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $2,277 $41,745 n/a
OR0775 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $563 $261 n/a
OR0773 # 01 Y:2023 01 2023 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $5,439 $1,278 n/a
OR0773 # 02 Y:2023 02 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $1,051 $797 n/a
OR0773 # 03 Y:2023 03 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,507 $13,124 n/a
OR0773 # 04 Y:2023 04 2023 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,262 $12,121 n/a
OR0757 # 02 Y:2022 02 2022 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $26,900 $0 Not Implemented
OR0757 # 03 Y:2022 03 2022 INSTALL AUTOMATIC PACKING EQUIPMENT $97,200 $50,000 Not Implemented
OR0757 # 04 Y:2022 04 2022 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $194,400 $300,000 Not Implemented
OR0757 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,612 $0 Not Implemented
OR0694 # 02 Y:2017 02 2017 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $78,503 $7,018 Not Implemented
OR0694 # 03 Y:2017 03 2017 INSTALL BACK-UP EQUIPMENT $219,130 $45,000 Not Implemented
OR0694 # 01 Y:2017 01 2017 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $190,250 $7,842 Not Implemented
OR0694 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,605 $10,606 Not Implemented
OR0694 # 06 Y:2017 06 2017 MINIMIZE WATER USAGE $8,079 $15,125 Not Implemented
OR0694 # 04 Y:2017 04 2017 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $29,962 $12,100 Not Implemented
OR0626 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,463 $3,437 Not Implemented
OR0626 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $3,138 $5,659 Not Implemented
OR0626 # 01 Y:2014 01 2014 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $18,202 $6,792 Not Implemented
OR0626 # 04 Y:2014 04 2014 UPGRADE CONTROLS ON COMPRESSORS $7,138 $5,500 Not Implemented