Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
185
matching recommendationsSIC | 2037 | Frozen Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0780 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,666 | $24,285 | Not Implemented |
OR0780 # 03 Y:2023 | 03 | 2023 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $2,453 | $14,157 | Not Implemented |
OR0780 # 01 Y:2023 | 01 | 2023 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $35,316 | $540,000 | Not Implemented |
OR0780 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,517 | $2,000 | Implemented |
OR0775 # 01 Y:2023 | 01 | 2023 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $174,406 | $233,000 | Not Implemented |
OR0775 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $2,277 | $41,745 | Not Implemented |
OR0775 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $563 | $261 | Not Implemented |
OR0773 # 01 Y:2023 | 01 | 2023 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $5,439 | $1,278 | Implemented |
OR0773 # 02 Y:2023 | 02 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,051 | $797 | Implemented |
OR0773 # 03 Y:2023 | 03 | 2023 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $8,507 | $13,124 | Not Implemented |
OR0773 # 04 Y:2023 | 04 | 2023 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,262 | $12,121 | Not Implemented |
OR0757 # 02 Y:2022 | 02 | 2022 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $26,900 | $0 | Not Implemented |
OR0757 # 03 Y:2022 | 03 | 2022 | INSTALL AUTOMATIC PACKING EQUIPMENT | $97,200 | $50,000 | Not Implemented |
OR0757 # 04 Y:2022 | 04 | 2022 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $194,400 | $300,000 | Not Implemented |
OR0757 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,612 | $0 | Not Implemented |
OR0694 # 02 Y:2017 | 02 | 2017 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $78,503 | $7,018 | Not Implemented |
OR0694 # 03 Y:2017 | 03 | 2017 | INSTALL BACK-UP EQUIPMENT | $219,130 | $45,000 | Not Implemented |
OR0694 # 01 Y:2017 | 01 | 2017 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $190,250 | $7,842 | Not Implemented |
OR0694 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,605 | $10,606 | Not Implemented |
OR0694 # 06 Y:2017 | 06 | 2017 | MINIMIZE WATER USAGE | $8,079 | $15,125 | Not Implemented |
OR0694 # 04 Y:2017 | 04 | 2017 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $29,962 | $12,100 | Not Implemented |
OR0626 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,463 | $3,437 | Not Implemented |
OR0626 # 06 Y:2014 | 06 | 2014 | INSULATE BARE EQUIPMENT | $3,138 | $5,659 | Not Implemented |
OR0626 # 01 Y:2014 | 01 | 2014 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $18,202 | $6,792 | Not Implemented |
OR0626 # 04 Y:2014 | 04 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $7,138 | $5,500 | Not Implemented |