IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

437

matching recommendations
Reset
SIC 2038 Frozen Specialties, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0113 # 01 Y:2006 01 2006 CONDENSE OPERATION INTO ONE BUILDING $333,734 $180,000 Not Implemented
LM0113 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,650 $16,170 Not Implemented
LM0113 # 03 Y:2006 03 2006 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $35,020 $500 Not Implemented
LM0108 # 01 Y:2006 01 2006 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $42,160 $64,000 Not Implemented
LM0108 # 02 Y:2006 02 2006 UPGRADE CONTROLS ON COMPRESSORS $9,822 $0 Not Implemented
LM0108 # 03 Y:2006 03 2006 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $287,197 $0 Implemented
LM0108 # 04 Y:2006 04 2006 SCHEDULE DELIVERIES ACCORDING TO DEMAND $16,460 $0 Implemented
LM0108 # 05 Y:2006 05 2006 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $184,119 $15,120 Implemented
OK0701 # 01 Y:2005 01 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $11,182 $123,420 Implemented
OK0701 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,527 $3,807 Not Implemented
OK0701 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $43,354 $1,623 Implemented
OK0701 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,396 $8,850 Implemented
OK0701 # 05 Y:2005 05 2005 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $19,082 $13,500 Not Implemented
OK0701 # 06 Y:2005 06 2005 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $4,169 $275 Not Implemented
OK0695 # 01 Y:2004 01 2004 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $35,493 $329,564 Not Implemented
OK0695 # 02 Y:2004 02 2004 RECOVER WASTE HEAT FROM EQUIPMENT $17,436 $17,500 Not Implemented
OK0695 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,386 $4,515 Not Implemented
OK0695 # 04 Y:2004 04 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,723 $21,750 Implemented
OK0695 # 05 Y:2004 05 2004 COMBINE UTILITY METERS $2,354 $2,546 Not Implemented
OK0695 # 06 Y:2004 06 2004 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $6,830 $0 Implemented
OK0695 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,073 $23,985 Not Implemented
IC0079 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $522 $400 Implemented
IC0079 # 02 Y:2004 02 2004 USE OPTIMUM TEMPERATURE $4,226 $0 Not Implemented
IC0079 # 03 Y:2004 03 2004 INSTALL AUTOMATIC STACK DAMPER $943 $375 Not Implemented
IC0079 # 04 Y:2004 04 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $311 $224 Implemented