IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,021

matching recommendations
Reset
SIC 204 Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0248 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,859 $600 Implemented
UF0248 # 05 Y:2000 05 2000 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,292 $6,686 Implemented
UF0248 # 07 Y:2000 07 2000 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $1,786 $909 Implemented
UF0248 # 08 Y:2000 08 2000 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $7,800 $500 Implemented
CO0451 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,080 $4,000 Implemented
CO0451 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $220 $20 Implemented
CO0451 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $190 $320 Implemented
ND0324 # 02 Y:1999 02 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,051 $250 Implemented
ND0324 # 03 Y:1999 03 1999 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $7,258 $30,000 Implemented
ND0324 # 07 Y:1999 07 1999 REDUCE SCRAP PRODUCTION $11,250 $7,200 Implemented
KU0517 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,360 $2,580 Implemented
KU0517 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,430 $350 Implemented
KU0517 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $1,100 $1,950 Implemented
KU0517 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $240 $250 Implemented
KU0516 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $17,580 $24,400 Implemented
KU0516 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,520 $8,930 Implemented
KU0516 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,770 $670 Implemented
KU0516 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,220 $870 Implemented
KU0516 # 08 Y:1999 08 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $49,760 $35,000 Implemented
ND0322 # 02 Y:1999 02 1999 USE OPTIMUM TEMPERATURE $161 $0 Implemented
UL0213 # 02 Y:1999 02 1999 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $21,700 $25,000 Implemented
UL0213 # 03 Y:1999 03 1999 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $93,500 $12,000 Implemented
AM0339 # 02 Y:1999 02 1999 REPAIR AND ELIMINATE STEAM LEAKS $2,575 $1,500 Implemented
AM0339 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $830 $64 Implemented
AM0339 # 07 Y:1999 07 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $500 $0 Implemented