IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,031

matching recommendations
Reset
SIC 204 Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0516 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,520 $8,930 Implemented
KU0516 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,770 $670 Implemented
KU0516 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,220 $870 Implemented
KU0516 # 08 Y:1999 08 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $49,760 $35,000 Implemented
ND0322 # 02 Y:1999 02 1999 USE OPTIMUM TEMPERATURE $161 $0 Implemented
UL0213 # 02 Y:1999 02 1999 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $21,700 $25,000 Implemented
UL0213 # 03 Y:1999 03 1999 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $93,500 $12,000 Implemented
AM0339 # 02 Y:1999 02 1999 REPAIR AND ELIMINATE STEAM LEAKS $2,575 $1,500 Implemented
AM0339 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $830 $64 Implemented
AM0339 # 07 Y:1999 07 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $500 $0 Implemented
AM0339 # 08 Y:1999 08 1999 INSULATE BARE EQUIPMENT $240 $1,360 Implemented
MO0247 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,594 $3,453 Implemented
MO0247 # 04 Y:1999 04 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $327 $0 Implemented
ME0249 # 01 Y:1998 01 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,619 $30,000 Implemented
ME0249 # 02 Y:1998 02 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,032 $0 Implemented
ME0249 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,322 $4,465 Implemented
ME0249 # 04 Y:1998 04 1998 INSTALL SET-BACK TIMERS $1,036 $600 Implemented
ME0249 # 05 Y:1998 05 1998 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $357 $240 Implemented
ME0249 # 06 Y:1998 06 1998 PAY BILLS ON TIME TO AVOID LATE FEES $225 $0 Implemented
KU0495 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,680 $390 Implemented
KU0495 # 03 Y:1998 03 1998 USE SYNTHETIC LUBRICANT $3,080 $2,650 Implemented
KU0495 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,380 $1,490 Implemented
KU0495 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,550 $490 Implemented
KU0495 # 09 Y:1998 09 1998 METER WASTE WATER $850 $100 Implemented
OK0548 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,020 $400 Implemented