IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 2041 Flour And Other Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0607 # 08 Y:2021 08 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $487 $540 Not Implemented
SD0607 # 07 Y:2021 07 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $481 $706 Not Implemented
SD0607 # 06 Y:2021 06 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $794 $760 Not Implemented
SD0607 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,289 $2,741 Not Implemented
SD0607 # 04 Y:2021 04 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,753 $568 Not Implemented
SD0607 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,885 $2,100 Not Implemented
SD0607 # 01 Y:2021 01 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $26,888 $500 Not Implemented
SD0607 # 02 Y:2021 02 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $17,809 $38,800 Not Implemented
SD0465 # 02 Y:2013 02 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,606 $29,550 Not Implemented
SD0465 # 06 Y:2013 06 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,113 $200 Not Implemented
SD0465 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,318 $1,521 Not Implemented
SD0465 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,677 $200 Implemented
SD0465 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,054 $2,000 Implemented
SD0465 # 01 Y:2013 01 2013 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $18,166 $60,710 Not Implemented
SD0465 # 07 Y:2013 07 2013 USE PHOTOCELL CONTROLS $402 $1,100 Not Implemented
SF0316 # 01 Y:2005 01 2005 REPAIR AND ELIMINATE STEAM LEAKS $4,516 $0 Implemented
SF0316 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,068 $0 Implemented
SF0316 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,320 $1,512 Implemented
SF0316 # 07 Y:2005 07 2005 OPTIMIZE PLANT POWER FACTOR $1,998 $3,852 Not Implemented
SF0316 # 06 Y:2005 06 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,504 $2,562 Implemented
SF0316 # 03 Y:2005 03 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $472 $0 Implemented
SF0316 # 04 Y:2005 04 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $43,493 $15,595 Not Implemented
SF0208 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,718 $776 Implemented
SF0208 # 08 Y:2001 08 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $804 $1,359 Not Implemented
SF0208 # 09 Y:2001 09 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,295 $9,000 Not Implemented