IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
SIC 2043 Cereal Breakfast Foods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0448 # 05 Y:2014 05 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,680 $9,880 Implemented
BD0448 # 15 Y:2014 15 2014 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $10,650 $30,000 Implemented
BD0448 # 13 Y:2014 13 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $668 $600 Implemented
BD0448 # 12 Y:2014 12 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,070 $40 Implemented
BD0448 # 06 Y:2014 06 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $13,135 $30,000 Implemented
BD0448 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $3,869 $1,625 Implemented
BD0448 # 08 Y:2014 08 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,695 $3,000 Implemented
BD0448 # 09 Y:2014 09 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,990 $1,000 Implemented
SF0428 # 07 Y:2013 07 2013 INSULATE BARE EQUIPMENT $1,669 $1,332 Implemented
SF0428 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,736 $1,751 Implemented
SF0428 # 02 Y:2013 02 2013 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $5,121 $0 Implemented
SF0428 # 01 Y:2013 01 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,313 $0 Implemented
SF0428 # 10 Y:2013 10 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,972 $12,679 Implemented
UW0023 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,974 $120,000 Implemented
UW0023 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,851 $2,500 Implemented
UW0023 # 03 Y:2009 03 2009 ADJUST BURNERS FOR EFFICIENT OPERATION $7,267 $200,000 Implemented
CO0589 # 02 Y:2006 02 2006 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $56,580 $570 Implemented
CO0589 # 03 Y:2006 03 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $950 $500 Implemented
CO0589 # 04 Y:2006 04 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $23,960 $0 Implemented
SF0311 # 17 Y:2005 17 2005 REUSE / RECYCLE/ SELL PAPER PRODUCTS $19,680 $12,330 Implemented
SF0311 # 07 Y:2005 07 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,363 $6,375 Implemented
SF0311 # 04 Y:2005 04 2005 REPAIR OR REPLACE STEAM TRAPS $24,768 $2,108 Implemented
SF0311 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,048 $0 Implemented
SF0311 # 01 Y:2005 01 2005 REPAIR AND ELIMINATE STEAM LEAKS $133,918 $0 Implemented
IA0333 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,246 $500 Implemented