IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

877

matching recommendations
Reset
SIC 2048 Prepared Feeds, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0105 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,669 $1,900 Implemented
UA0105 # 08 Y:2013 08 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,189 $596 Implemented
OK0857 # 01 Y:2013 01 2013 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $46,232 $492,750 Not Implemented
MS0391 # 01 Y:2012 01 2012 REPAIR AND ELIMINATE STEAM LEAKS $15,275 $606 Not Implemented
MS0391 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $360 $1,800 Not Implemented
IA0471 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $262 $250 Implemented
IA0471 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $979 $1,463 Implemented
IA0471 # 03 Y:2011 03 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $1,799 $227 Implemented
IA0471 # 04 Y:2011 04 2011 UPGRADE CONTROLS ON COMPRESSORS $2,430 $3,832 Implemented
IA0471 # 05 Y:2011 05 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $465 $3,000 Implemented
IA0471 # 06 Y:2011 06 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,974 $1,500 Implemented
OK0803 # 01 Y:2011 01 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $17,686 $22,080 Implemented
OK0803 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,156 $13,723 Not Implemented
OK0803 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $74 $524 Not Implemented
OK0803 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,212 $2,024 Not Implemented
OK0803 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $208 $300 Implemented
OK0803 # 06 Y:2011 06 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $2,896 $1,465 Implemented
OK0803 # 07 Y:2011 07 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,821 $18,906 Implemented
UF0433 # 01 Y:2010 01 2010 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,771 $2,321 Not Implemented
UF0433 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,098 $314 Implemented
UF0433 # 03 Y:2010 03 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,138 $8,558 Not Implemented
UF0433 # 04 Y:2010 04 2010 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $21,987 $10,000 Not Implemented
UF0433 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,205 $0 Implemented
UF0433 # 06 Y:2010 06 2010 DEVELOP A REPAIR/REPLACE POLICY $621 $0 Implemented
UF0433 # 07 Y:2010 07 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,610 $0 Implemented