IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

877

matching recommendations
Reset
SIC 2048 Prepared Feeds, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0433 # 08 Y:2010 08 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,722 $6,350 Not Implemented
UF0433 # 09 Y:2010 09 2010 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $23,836 $4,000 Not Implemented
UF0433 # 10 Y:2010 10 2010 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $1,885 $816 Implemented
WV0384 # 01 Y:2008 01 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,545 $1,000 Not Implemented
WV0384 # 02 Y:2008 02 2008 DEVELOP A REPAIR/REPLACE POLICY $10,724 $1,094 Implemented
WV0384 # 03 Y:2008 03 2008 RECOVER WASTE HEAT FROM EQUIPMENT $3,084 $1,070 Not Implemented
WV0384 # 04 Y:2008 04 2008 INSULATE BARE EQUIPMENT $2,032 $577 Not Implemented
WV0384 # 05 Y:2008 05 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,872 $2,000 Not Implemented
WV0384 # 06 Y:2008 06 2008 OPTIMIZE PLANT POWER FACTOR $1,800 $11,500 Not Implemented
WV0384 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,609 $6,026 Implemented
WV0384 # 08 Y:2008 08 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $870 $308 Implemented
WV0384 # 09 Y:2008 09 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $364 $438 Implemented
WV0384 # 10 Y:2008 10 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $352 $25 Implemented
UD0780 # 01 Y:2008 01 2008 INSULATE BARE EQUIPMENT $31,350 $8,290 Not Implemented
UD0780 # 02 Y:2008 02 2008 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $28,671 $23,190 Not Implemented
UD0780 # 03 Y:2008 03 2008 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $14,100 $18,000 Not Implemented
UD0780 # 04 Y:2008 04 2008 INCREASE AMOUNT OF CONDENSATE RETURNED $12,693 $7,000 Implemented
UD0780 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,375 $30,000 Not Implemented
UD0780 # 06 Y:2008 06 2008 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $6,428 $4,000 Implemented
UD0780 # 07 Y:2008 07 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,689 $0 Not Implemented
UD0780 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,293 $10,770 Not Implemented
UD0780 # 09 Y:2008 09 2008 REPAIR AND ELIMINATE STEAM LEAKS $4,058 $700 Not Implemented
UD0780 # 10 Y:2008 10 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,382 $12,224 Not Implemented
UD0780 # 11 Y:2008 11 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,749 $1,500 Not Implemented
UD0780 # 12 Y:2008 12 2008 INCREASE AMOUNT OF CONDENSATE RETURNED $2,587 $950 Not Implemented