IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,411

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0265 # 02 Y:2022 02 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,737 $23,601 Not Implemented
UA0265 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $14,987 $4,205 Not Implemented
UA0265 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,413 $5,533 Not Implemented
UA0265 # 05 Y:2022 05 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $33,503 $34,984 Not Implemented
LS2301 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $4,756 $400 Implemented
LS2301 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,199 $135 Implemented
LS2301 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,351 $2,409 Implemented
LS2301 # 04 Y:2023 04 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,956 $10,664 Implemented
LS2301 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $459 $2,100 Implemented
AM0861 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $238,650 $7,000 Implemented
AM0861 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,100 $9,940 Implemented
AM0861 # 03 Y:2023 03 2023 OPTIMIZE PLANT POWER FACTOR $18,300 $41,680 Not Implemented
AM0861 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,960 $460 Implemented
AM0861 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,870 $13 Implemented
AM0861 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $700 $0 Implemented
AM0861 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $101 $214 Not Implemented
LE0536 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,791 $0 Implemented
LE0536 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,036 $2,440 Implemented
LE0536 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,974 $35,815 Implemented
LE0536 # 04 Y:2023 04 2023 PREHEAT COMBUSTION AIR WITH WASTE HEAT $28,034 $80,000 Not Implemented
LE0536 # 05 Y:2023 05 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,556 $15,000 Not Implemented
LE0536 # 06 Y:2023 06 2023 ELIMINATE A BY-PRODUCT $188,025 $700,000 Not Implemented
LE0536 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,147 $200,000 Not Implemented
LT8363 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $5,980 $10,022 Not Implemented
LT8363 # 02 Y:2022 02 2022 CHANGE OPERATING CONDITIONS $46,622 $0 Not Implemented