Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

127

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0595 # 02 Y:2023 02 2023 USE OPTIMUM THICKNESS INSULATION $2,174 $1,800 Implemented
SF0595 # 01 Y:2023 01 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,809 $1,487 Implemented
SF0595 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,280 $7,191 Implemented
SF0595 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,989 $21,654 Implemented
SF0595 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,469 $5,620 Implemented
SF0546 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,375 $542 Implemented
SD0569 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,832 $13,363 Implemented
SD0569 # 05 Y:2018 05 2018 USE PHOTOCELL CONTROLS $2,839 $11,100 Implemented
SD0569 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,921 $2,000 Implemented
SF0495 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $2,590 $6,532 Implemented
SF0495 # 04 Y:2016 04 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,447 $8,329 Implemented
SF0495 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,370 $6,127 Implemented
SF0495 # 01 Y:2016 01 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,207 $661 Implemented
SF0471 # 02 Y:2015 02 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $554 $134 Implemented
SF0470 # 03 Y:2015 03 2015 INCREASE AMOUNT OF CONDENSATE RETURNED $26,563 $30,811 Implemented
SF0470 # 04 Y:2015 04 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,546 $11,844 Implemented
SF0470 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,206 $17,797 Implemented
SF0470 # 02 Y:2015 02 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,421 $3,541 Implemented
SF0470 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,220 $4,488 Implemented
SF0470 # 06 Y:2015 06 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $91,176 $450,224 Implemented
SD0499 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,182 $200 Implemented
SD0499 # 03 Y:2015 03 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $904 $3,025 Implemented
SD0499 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $412 $1,300 Implemented
SD0421 # 02 Y:2009 02 2009 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $35,684 $50,000 Implemented
SD0421 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,149 $2,700 Implemented