IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 206 Sugar And Confectionery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0411 # 02 Y:2016 02 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,142 $25 Implemented
LE0411 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $3,533 $150 Implemented
LE0411 # 04 Y:2016 04 2016 INSTALL TIMERS AND/OR THERMOSTATS $3,292 $625 Implemented
LE0411 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $21,409 $9,106 Implemented
LE0411 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,675 $1,000 Implemented
LE0411 # 08 Y:2016 08 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $58,696 $100,000 Implemented
LE0411 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,246 $16,912 Implemented
LE0411 # 01 Y:2016 01 2016 INSTALL TIMERS AND/OR THERMOSTATS $22 $0 Implemented
LE0284 # 10 Y:2009 10 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,713 $224 Implemented
LE0284 # 09 Y:2009 09 2009 REPAIR OR REPLACE STEAM TRAPS $2,855 $2,000 Implemented
LE0284 # 08 Y:2009 08 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,911 $320 Implemented
LE0284 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,628 $1,760 Implemented
LE0233 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,514 $12,000 Implemented
LE0233 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,332 $800 Implemented
WV0130 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,013 $235 Implemented
WV0130 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $184 $249 Implemented
WV0130 # 03 Y:1997 03 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $391 $680 Implemented
WV0130 # 05 Y:1997 05 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $107 $80 Implemented
WV0130 # 09 Y:1997 09 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $82 $33 Implemented
WV0130 # 13 Y:1997 13 1997 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $47,040 $0 Implemented
HO0051 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,993 $3,250 Implemented
HO0051 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,141 $7,715 Implemented
HO0051 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,441 $7,564 Implemented
ST0067 # 01 Y:1986 01 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,304 $0 Implemented
ST0067 # 03 Y:1986 03 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,202 $30,000 Implemented