IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,502

matching recommendations
Reset
SIC 208 Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0461 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,905 $3,053 Implemented
SF0461 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $2,517 $4,371 Implemented
SF0461 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,570 $7,605 Implemented
SF0461 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,819 $80,476 Implemented
SF0461 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN WATER LINES AND VALVES $666 $50 Implemented
OK0907 # 01 Y:2015 01 2015 INSTALL OCCUPANCY SENSORS $1,237 $706 Implemented
OK0907 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $1,302 $332 Implemented
OK0907 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,448 $1,250 Implemented
OK0907 # 07 Y:2015 07 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,403 $800 Implemented
OK0907 # 09 Y:2015 09 2015 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,429 $960 Implemented
OK0907 # 11 Y:2015 11 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,466 $0 Implemented
OK0907 # 12 Y:2015 12 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,510 $3,052 Implemented
DL0137 # 01 Y:2014 01 2014 INCREASE AMOUNT OF CONDENSATE RETURNED $17,190 $20,000 Implemented
DL0137 # 07 Y:2014 07 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $2,350 $6,300 Implemented
DL0137 # 08 Y:2014 08 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $970 $1,200 Implemented
LE0386 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,661 $32 Implemented
LE0386 # 02 Y:2014 02 2014 REPAIR AND ELIMINATE STEAM LEAKS $61,300 $2,592 Implemented
LE0386 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,910 $1,000 Implemented
LE0386 # 04 Y:2014 04 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $43,975 $10,000 Implemented
LE0386 # 06 Y:2014 06 2014 PREHEAT COMBUSTION AIR WITH WASTE HEAT $12,502 $16,700 Implemented
LE0386 # 09 Y:2014 09 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $757 $2,250 Implemented
OR0636 # 03 Y:2014 03 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $5,708 $7,000 Implemented
SU0365 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,680 $0 Implemented
SU0365 # 02 Y:2014 02 2014 USE SYNTHETIC LUBRICANT $3,020 $0 Implemented
SU0365 # 03 Y:2014 03 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,916 $0 Implemented