Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
45
matching recommendationsSIC | 208 | Beverages |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0770 # 03 Y:2023 | 03 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,249 | $9,000 | Implemented |
OR0770 # 01 Y:2023 | 01 | 2023 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $2,142 | $6,704 | Implemented |
OR0745 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,286 | $485 | Implemented |
OR0745 # 02 Y:2021 | 02 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,360 | $542 | Implemented |
OR0745 # 01 Y:2021 | 01 | 2021 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $11,633 | $395 | Implemented |
OR0725 # 02 Y:2019 | 02 | 2019 | RECOVER AND REUSE WASTE MATERIAL | $58,445 | $110,790 | Implemented |
OR0725 # 03 Y:2019 | 03 | 2019 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $126,211 | $375,000 | Implemented |
OR0717 # 01 Y:2019 | 01 | 2019 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $1,163 | $0 | Implemented |
OR0678 # 02 Y:2016 | 02 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,663 | $247 | Implemented |
OR0678 # 03 Y:2016 | 03 | 2016 | INSULATE BARE EQUIPMENT | $972 | $2,626 | Implemented |
OR0636 # 03 Y:2014 | 03 | 2014 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $5,708 | $7,000 | Implemented |
OR0632 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $2,497 | $2,837 | Implemented |
OR0632 # 04 Y:2014 | 04 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $870 | $500 | Implemented |
OR0591 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,274 | $6,968 | Implemented |
OR0591 # 01 Y:2012 | 01 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $920,649 | $25,909 | Implemented |
OR0515 # 01 Y:2007 | 01 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,800 | $0 | Implemented |
OR0515 # 03 Y:2007 | 03 | 2007 | INSTALL OCCUPANCY SENSORS | $14,600 | $45,000 | Implemented |
OR0515 # 02 Y:2007 | 02 | 2007 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,200 | $0 | Implemented |
OR0364 # 01 Y:2000 | 01 | 2000 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $8,700 | $600 | Implemented |
OR0304 # 01 Y:1997 | 01 | 1997 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $13,502 | $0 | Implemented |
OR0304 # 03 Y:1997 | 03 | 1997 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $9,530 | $0 | Implemented |
OR0304 # 04 Y:1997 | 04 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $450 | $500 | Implemented |
OR0304 # 06 Y:1997 | 06 | 1997 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,300 | $0 | Implemented |
OR0304 # 07 Y:1997 | 07 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,988 | $5,910 | Implemented |
OR0304 # 10 Y:1997 | 10 | 1997 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $3,460 | $610 | Implemented |