IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 208 Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0835 # 12 Y:2012 12 2012 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $31,425 $0 Implemented
OK0835 # 11 Y:2012 11 2012 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $621 $120 Implemented
OK0835 # 10 Y:2012 10 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,937 $1,000 Implemented
OK0835 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $538 $3,183 Implemented
OK0835 # 01 Y:2012 01 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,445 $1,500 Implemented
UM0411 # 03 Y:2012 03 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $821 $100 Implemented
OR0591 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,274 $6,968 Implemented
OR0591 # 01 Y:2012 01 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $920,649 $25,909 Implemented
SF0420 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $936 $555 Implemented
SF0420 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,156 $840 Implemented
SF0416 # 01 Y:2012 01 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,478 $0 Implemented
SF0416 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,614 $18,273 Implemented
WV0446 # 08 Y:2012 08 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,963 $2,500 Implemented
WV0446 # 04 Y:2012 04 2012 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $16,273 $1,000 Implemented
WV0446 # 09 Y:2012 09 2012 DEVELOP A REPAIR/REPLACE POLICY $6,712 $5,683 Implemented
WV0446 # 11 Y:2012 11 2012 REPAIR OR REPLACE STEAM TRAPS $3,610 $4,438 Implemented
WV0446 # 12 Y:2012 12 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,862 $1,070 Implemented
WV0446 # 15 Y:2012 15 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,151 $70 Implemented
WV0446 # 17 Y:2012 17 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,153 $475 Implemented
BS0001 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96 $160 Implemented
BS0001 # 09 Y:2012 09 2012 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,158 $2,282 Implemented
BS0001 # 06 Y:2012 06 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,034 $200 Implemented
BS0001 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,664 $1,616 Implemented
BS0001 # 03 Y:2012 03 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,703 $0 Implemented
BS0001 # 02 Y:2012 02 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $19,506 $35,200 Implemented