Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 208 | Beverages |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0631 # 04 Y:2014 | 04 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $800 | $417 | Implemented |
OR0631 # 03 Y:2014 | 03 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,567 | $1,634 | Implemented |
OR0631 # 01 Y:2014 | 01 | 2014 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $11,360 | $250 | Implemented |
OR0629 # 04 Y:2014 | 04 | 2014 | REPLACE BOILER | $523,306 | $3,403,664 | Implemented |
OR0629 # 03 Y:2014 | 03 | 2014 | RECOVER AND REUSE COOLING WATER | $58,681 | $3,764 | Implemented |
OR0629 # 01 Y:2014 | 01 | 2014 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $37,907 | $21,000 | Implemented |
UW0050 # 01 Y:2011 | 01 | 2011 | PAY BILLS ON TIME TO AVOID LATE FEES | $0 | $0 | Implemented |
UW0049 # 02 Y:2011 | 02 | 2011 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $9,443 | $7,200 | Implemented |
UW0049 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,756 | $1,300 | Implemented |
OR0494 # 05 Y:2005 | 05 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $55,000 | $3,100 | Implemented |
OR0494 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,100 | $0 | Implemented |
OR0494 # 07 Y:2005 | 07 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,400 | $0 | Implemented |
OR0494 # 08 Y:2005 | 08 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,100 | $0 | Implemented |
OR0494 # 09 Y:2005 | 09 | 2005 | REDUCE FLUID FLOW RATES | $2,400 | $0 | Implemented |
OR0494 # 11 Y:2005 | 11 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,400 | $6,500 | Implemented |
OR0494 # 13 Y:2005 | 13 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,800 | $49,400 | Implemented |
OR0494 # 14 Y:2005 | 14 | 2005 | $107,700 | $340,000 | Implemented | |
OR0494 # 03 Y:2005 | 03 | 2005 | REDUCE FLUID FLOW RATES | $54,700 | $630 | Implemented |
OR0494 # 02 Y:2005 | 02 | 2005 | REDUCE FLUID FLOW RATES | $63,500 | $0 | Implemented |
OR0483 # 05 Y:2005 | 05 | 2005 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $41,000 | $69,000 | Implemented |
OR0483 # 04 Y:2005 | 04 | 2005 | $8,960 | $3,000 | Implemented | |
OR0483 # 06 Y:2005 | 06 | 2005 | $40,390 | $72,000 | Implemented | |
OR0483 # 01 Y:2005 | 01 | 2005 | RECOVER AND REUSE WASTE MATERIAL | $21,624 | $0 | Implemented |
OR0483 # 03 Y:2005 | 03 | 2005 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $21,300 | $5,100 | Implemented |
OR0483 # 02 Y:2005 | 02 | 2005 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $24,290 | $4,400 | Implemented |