Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 2082 | Malt Beverages |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0615 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $385 | $1,182 | Implemented |
SD0615 # 02 Y:2021 | 02 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $540 | $0 | Implemented |
SD0615 # 01 Y:2021 | 01 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,310 | $6,942 | Implemented |
SD0612 # 08 Y:2021 | 08 | 2021 | REPAIR AND ELIMINATE STEAM LEAKS | $557 | $1,000 | Implemented |
SD0612 # 04 Y:2021 | 04 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $957 | $0 | Implemented |
SD0612 # 03 Y:2021 | 03 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,826 | $9,545 | Implemented |
SD0612 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,879 | $12,356 | Implemented |
SD0612 # 01 Y:2021 | 01 | 2021 | REDESIGN PROCESS | $39,942 | $13,000 | Implemented |
SF0550 # 02 Y:2020 | 02 | 2020 | INSULATE BARE EQUIPMENT | $1,259 | $787 | Implemented |
SF0550 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,782 | $1,359 | Implemented |
SF0550 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,809 | $17,557 | Implemented |
SF0550 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,899 | $4,002 | Implemented |
SF0550 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,560 | $12,365 | Implemented |
SD0585 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,052 | $8,453 | Implemented |
SD0585 # 03 Y:2019 | 03 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,603 | $200 | Implemented |
SD0481 # 09 Y:2014 | 09 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,553 | $2,325 | Implemented |
SD0481 # 08 Y:2014 | 08 | 2014 | REPAIR AND ELIMINATE STEAM LEAKS | $2,220 | $1,200 | Implemented |
SD0481 # 07 Y:2014 | 07 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,167 | $16,320 | Implemented |
SD0481 # 06 Y:2014 | 06 | 2014 | MAINTAIN MACHINES TO REDUCE LEAKS | $14,877 | $5,000 | Implemented |
SD0481 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,116 | $2,600 | Implemented |
SD0481 # 03 Y:2014 | 03 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $31,839 | $1,000 | Implemented |
SD0481 # 02 Y:2014 | 02 | 2014 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $36,872 | $91,000 | Implemented |
SD0481 # 01 Y:2014 | 01 | 2014 | USE COLD WASTE WATER TO COOL CHILLER FEED WATER | $134,111 | $80,720 | Implemented |
NV0072 # 08 Y:1996 | 08 | 1996 | INSULATE BARE EQUIPMENT | $6,756 | $890 | Implemented |
NV0072 # 04 Y:1996 | 04 | 1996 | INSTALL OCCUPANCY SENSORS | $4,438 | $558 | Implemented |