Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 2082 | Malt Beverages |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0770 # 03 Y:2023 | 03 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,249 | $9,000 | Implemented |
OR0770 # 01 Y:2023 | 01 | 2023 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $2,142 | $6,704 | Implemented |
OR0725 # 03 Y:2019 | 03 | 2019 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $126,211 | $375,000 | Implemented |
OR0725 # 02 Y:2019 | 02 | 2019 | RECOVER AND REUSE WASTE MATERIAL | $58,445 | $110,790 | Implemented |
OR0717 # 01 Y:2019 | 01 | 2019 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $1,163 | $0 | Implemented |
OR0678 # 03 Y:2016 | 03 | 2016 | INSULATE BARE EQUIPMENT | $972 | $2,626 | Implemented |
OR0678 # 02 Y:2016 | 02 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,663 | $247 | Implemented |
OR0636 # 03 Y:2014 | 03 | 2014 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $5,708 | $7,000 | Implemented |
OR0591 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,274 | $6,968 | Implemented |
OR0591 # 01 Y:2012 | 01 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $920,649 | $25,909 | Implemented |
OR0364 # 01 Y:2000 | 01 | 2000 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $8,700 | $600 | Implemented |
OR0304 # 03 Y:1997 | 03 | 1997 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $9,530 | $0 | Implemented |
OR0304 # 12 Y:1997 | 12 | 1997 | MINIMIZE WATER USAGE | $2,305 | $0 | Implemented |
OR0304 # 10 Y:1997 | 10 | 1997 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $3,460 | $610 | Implemented |
OR0304 # 07 Y:1997 | 07 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,988 | $5,910 | Implemented |
OR0304 # 06 Y:1997 | 06 | 1997 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,300 | $0 | Implemented |
OR0304 # 04 Y:1997 | 04 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $450 | $500 | Implemented |
OR0304 # 01 Y:1997 | 01 | 1997 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $13,502 | $0 | Implemented |
OR0136 # 02 Y:1992 | 02 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $413 | $1,000 | Implemented |
OR0136 # 01 Y:1992 | 01 | 1992 | INSULATE BARE EQUIPMENT | $597 | $465 | Implemented |
OR0113 # 08 Y:1991 | 08 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $215 | $1,000 | Implemented |
OR0113 # 07 Y:1991 | 07 | 1991 | INSULATE BARE EQUIPMENT | $55 | $234 | Implemented |
OR0113 # 06 Y:1991 | 06 | 1991 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $588 | $1,500 | Implemented |
OR0113 # 05 Y:1991 | 05 | 1991 | TREAT AND REUSE RINSE WATERS | $366 | $0 | Implemented |
OR0113 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $211 | $319 | Implemented |