IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 2082 Malt Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0770 # 03 Y:2023 03 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,249 $9,000 Implemented
OR0770 # 01 Y:2023 01 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,142 $6,704 Implemented
OR0725 # 03 Y:2019 03 2019 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $126,211 $375,000 Implemented
OR0725 # 02 Y:2019 02 2019 RECOVER AND REUSE WASTE MATERIAL $58,445 $110,790 Implemented
OR0717 # 01 Y:2019 01 2019 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $1,163 $0 Implemented
OR0678 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $972 $2,626 Implemented
OR0678 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $1,663 $247 Implemented
OR0636 # 03 Y:2014 03 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $5,708 $7,000 Implemented
OR0591 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,274 $6,968 Implemented
OR0591 # 01 Y:2012 01 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $920,649 $25,909 Implemented
OR0364 # 01 Y:2000 01 2000 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $8,700 $600 Implemented
OR0304 # 03 Y:1997 03 1997 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $9,530 $0 Implemented
OR0304 # 12 Y:1997 12 1997 MINIMIZE WATER USAGE $2,305 $0 Implemented
OR0304 # 10 Y:1997 10 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,460 $610 Implemented
OR0304 # 07 Y:1997 07 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,988 $5,910 Implemented
OR0304 # 06 Y:1997 06 1997 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,300 $0 Implemented
OR0304 # 04 Y:1997 04 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $450 $500 Implemented
OR0304 # 01 Y:1997 01 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $13,502 $0 Implemented
OR0136 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $413 $1,000 Implemented
OR0136 # 01 Y:1992 01 1992 INSULATE BARE EQUIPMENT $597 $465 Implemented
OR0113 # 08 Y:1991 08 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $215 $1,000 Implemented
OR0113 # 07 Y:1991 07 1991 INSULATE BARE EQUIPMENT $55 $234 Implemented
OR0113 # 06 Y:1991 06 1991 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $588 $1,500 Implemented
OR0113 # 05 Y:1991 05 1991 TREAT AND REUSE RINSE WATERS $366 $0 Implemented
OR0113 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $211 $319 Implemented