IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

788

matching recommendations
Reset
SIC 2086 Bottled And Canned Soft Drinks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0245 # 14 Y:2006 14 2006 INSULATE BARE EQUIPMENT $2,426 $6,975 Implemented
BD0316 # 02 Y:2006 02 2006 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $4,724 $1,200 Implemented
BD0316 # 03 Y:2006 03 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $13,153 $8,363 Implemented
BD0316 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $1,033 $675 Implemented
BD0316 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $679 $2,102 Implemented
WV0342 # 01 Y:2006 01 2006 REPAIR OR REPLACE STEAM TRAPS $151,419 $4,500 Implemented
WV0342 # 02 Y:2006 02 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $124,707 $188,500 Implemented
WV0342 # 03 Y:2006 03 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $103,142 $100,000 Implemented
WV0342 # 04 Y:2006 04 2006 REDUCE EXCESSIVE BOILER BLOWDOWN $87,693 $208,500 Implemented
WV0342 # 05 Y:2006 05 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $76,391 $42,250 Implemented
WV0342 # 07 Y:2006 07 2006 OPERATE BOILERS ON HIGH FIRE SETTING $41,893 $112,000 Implemented
WV0342 # 08 Y:2006 08 2006 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $26,961 $1,000 Implemented
WV0342 # 09 Y:2006 09 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $26,439 $2,700 Implemented
WV0342 # 10 Y:2006 10 2006 USE SYNTHETIC LUBRICANT $23,049 $280 Implemented
WV0342 # 11 Y:2006 11 2006 INSULATE BARE EQUIPMENT $18,125 $2,570 Implemented
WV0342 # 12 Y:2006 12 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,068 $1,000 Implemented
WV0342 # 13 Y:2006 13 2006 DEVELOP A REPAIR/REPLACE POLICY $11,020 $1,348 Implemented
WV0342 # 14 Y:2006 14 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,759 $35 Implemented
WV0342 # 17 Y:2006 17 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,975 $2,344 Implemented
UU0098 # 01 Y:2006 01 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,060 $0 Implemented
UU0098 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,360 $2,100 Implemented
UU0098 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,690 $1,000 Implemented
UU0098 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $410 $2,880 Implemented
UU0098 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $2,380 $2,040 Implemented
CO0579 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,640 $300 Implemented