IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
SIC 2086 Bottled And Canned Soft Drinks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0051 # 05 Y:2010 05 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,963 $0 Not Implemented
MZ0051 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,408 $0 Not Implemented
MZ0051 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $544 $400 Not Implemented
MZ0051 # 08 Y:2010 08 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,123 $800 Not Implemented
MZ0051 # 09 Y:2010 09 2010 RECOVER WASTE HEAT FROM EQUIPMENT $32,817 $10,000 Not Implemented
BD0316 # 02 Y:2006 02 2006 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $4,724 $1,200 Implemented
BD0316 # 01 Y:2006 01 2006 USE SYNTHETIC LUBRICANT $7,871 $800 Not Implemented
BD0316 # 03 Y:2006 03 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $13,153 $8,363 Implemented
BD0316 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $1,033 $675 Implemented
BD0316 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $679 $2,102 Implemented
KU0493 # 06 Y:1998 06 1998 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $770 $600 Not Implemented
KU0493 # 01 Y:1998 01 1998 USE OPTIMUM TEMPERATURE $28,340 $3,500 Implemented
KU0493 # 02 Y:1998 02 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,810 $0 Not Implemented
KU0493 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,340 $9,530 Implemented
KU0493 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,290 $4,940 Implemented
KU0493 # 05 Y:1998 05 1998 ISOLATE HOT OR COLD EQUIPMENT $1,310 $1,000 Implemented
KU0493 # 07 Y:1998 07 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $600 $1,000 Implemented
KU0493 # 08 Y:1998 08 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $460 $540 Implemented
KU0493 # 09 Y:1998 09 1998 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $60,681 $3,050 Not Implemented
KU0493 # 10 Y:1998 10 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $77,980 $2,020 Not Implemented
KU0493 # 11 Y:1998 11 1998 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $580 $1,050 Implemented
KU0493 # 12 Y:1998 12 1998 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS $530 $90 Not Implemented
MO0198 # 09 Y:1997 09 1997 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $4,582 $8,400 Not Implemented
MO0198 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $148 $0 Implemented
MO0198 # 07 Y:1997 07 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $243 $48 Implemented