IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

127

matching recommendations
Reset
SIC 2087 Flavoring Extracts And Syrups, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0446 # 08 Y:2012 08 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,963 $2,500 Implemented
WV0446 # 12 Y:2012 12 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,862 $1,070 Implemented
WV0446 # 17 Y:2012 17 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,153 $475 Implemented
LE0323 # 09 Y:2011 09 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $778 $0 Implemented
LE0323 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $837 $2,921 Implemented
LE0323 # 06 Y:2011 06 2011 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $2,360 $6,000 Implemented
LE0323 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,384 $1,000 Implemented
NC0402 # 02 Y:2010 02 2010 CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING $3,632 $14,000 Implemented
NC0402 # 05 Y:2010 05 2010 DEVELOP A REPAIR/REPLACE POLICY $445 $1,454 Implemented
NC0402 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $497 $100 Implemented
NC0402 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,982 $0 Implemented
TA0127 # 01 Y:2006 01 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,212 $0 Implemented
TA0127 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,752 $0 Implemented
TA0127 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $625 $100 Implemented
LE0246 # 09 Y:2006 09 2006 INSTALL OCCUPANCY SENSORS $1,586 $450 Implemented
LE0246 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,948 $180,000 Implemented
LE0246 # 05 Y:2006 05 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $6,033 $5,000 Implemented
LE0246 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,683 $6,700 Implemented
LE0246 # 01 Y:2006 01 2006 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $66,327 $5,000 Implemented
OR0483 # 01 Y:2005 01 2005 RECOVER AND REUSE WASTE MATERIAL $21,624 $0 Implemented
OR0483 # 02 Y:2005 02 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $24,290 $4,400 Implemented
OR0483 # 04 Y:2005 04 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $8,960 $3,000 Implemented
OR0483 # 06 Y:2005 06 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $40,390 $72,000 Implemented
OR0483 # 03 Y:2005 03 2005 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $21,300 $5,100 Implemented
OR0483 # 05 Y:2005 05 2005 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $41,000 $69,000 Implemented