Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
260
matching recommendationsSIC | 2087 | Flavoring Extracts And Syrups, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0952 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,157 | $0 | Not Implemented |
UD0952 # 06 Y:2016 | 06 | 2016 | INSTALL TURBULATORS | $6,373 | $3,750 | Not Implemented |
UD0952 # 05 Y:2016 | 05 | 2016 | INSULATE FEEDWATER TANK | $983 | $509 | Not Implemented |
UD0952 # 08 Y:2016 | 08 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $1,652 | $800 | Implemented |
UD0952 # 01 Y:2016 | 01 | 2016 | COMBINE UTILITY METERS | $26,792 | $0 | Implemented |
UD0952 # 07 Y:2016 | 07 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,764 | $1,000 | Implemented |
UD0952 # 02 Y:2016 | 02 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,722 | $0 | Implemented |
LE0386 # 04 Y:2014 | 04 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $43,975 | $10,000 | Implemented |
LE0386 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,910 | $1,000 | Implemented |
LE0386 # 01 Y:2014 | 01 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,661 | $32 | Implemented |
LE0386 # 02 Y:2014 | 02 | 2014 | REPAIR AND ELIMINATE STEAM LEAKS | $61,300 | $2,592 | Implemented |
LE0386 # 05 Y:2014 | 05 | 2014 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $451 | $232 | Not Implemented |
LE0386 # 06 Y:2014 | 06 | 2014 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $12,502 | $16,700 | Implemented |
LE0386 # 08 Y:2014 | 08 | 2014 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,813 | $20,000 | Not Implemented |
LE0386 # 07 Y:2014 | 07 | 2014 | REPLACE BOILER | $102,338 | $161,800 | Not Implemented |
LE0386 # 09 Y:2014 | 09 | 2014 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $757 | $2,250 | Implemented |
LE0386 # 10 Y:2014 | 10 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,010 | $6,000 | Not Implemented |
OR0632 # 05 Y:2014 | 05 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $2,833 | $0 | Not Implemented |
OR0632 # 01 Y:2014 | 01 | 2014 | IMPROVE COMBUSTION CONTROL CAPABILITY | $3,802 | $0 | Not Implemented |
OR0632 # 04 Y:2014 | 04 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $870 | $500 | Implemented |
OR0632 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,285 | $0 | Not Implemented |
OR0632 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $2,497 | $2,837 | Implemented |
UD0874 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,338 | $6,405 | Not Implemented |
UD0874 # 07 Y:2013 | 07 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,535 | $0 | Implemented |
UD0874 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,148 | $51,240 | Not Implemented |