Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,340
matching recommendationsSIC | 209 | Misc. Food And Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0029 # 03 Y:2008 | 03 | 2008 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $44,793 | $11,000 | Implemented |
GT0855 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,022 | $9,780 | Implemented |
GT0855 # 02 Y:2008 | 02 | 2008 | INSTALL OCCUPANCY SENSORS | $1,127 | $1,120 | Implemented |
GT0855 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $795 | $500 | Implemented |
LL0302 # 01 Y:2008 | 01 | 2008 | AIR CONDITION ONLY SPACE NECESSARY | $14,663 | $30 | Implemented |
LL0302 # 03 Y:2008 | 03 | 2008 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,364 | $450 | Implemented |
SD0409 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,066 | $6,344 | Implemented |
SD0409 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,423 | $6,590 | Implemented |
SD0409 # 05 Y:2008 | 05 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,387 | $2,539 | Implemented |
SD0409 # 06 Y:2008 | 06 | 2008 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,067 | $183 | Implemented |
SU0272 # 02 Y:2008 | 02 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $21,466 | $0 | Implemented |
SU0272 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,013 | $0 | Implemented |
SU0272 # 05 Y:2008 | 05 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,164 | $173 | Implemented |
SU0272 # 06 Y:2008 | 06 | 2008 | INSTALL OCCUPANCY SENSORS | $2,414 | $535 | Implemented |
SU0272 # 07 Y:2008 | 07 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,418 | $1,650 | Implemented |
SU0272 # 08 Y:2008 | 08 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,762 | $31,086 | Implemented |
SF0361 # 01 Y:2008 | 01 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,816 | $0 | Implemented |
SF0361 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $701 | $0 | Implemented |
SF0361 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $237 | $162 | Implemented |
SF0361 # 04 Y:2008 | 04 | 2008 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,199 | $713 | Implemented |
SF0361 # 05 Y:2008 | 05 | 2008 | INSULATE BARE EQUIPMENT | $1,614 | $1,036 | Implemented |
SF0361 # 07 Y:2008 | 07 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,413 | $4,592 | Implemented |
UW0016 # 01 Y:2008 | 01 | 2008 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $29,638 | $0 | Implemented |
UW0016 # 04 Y:2008 | 04 | 2008 | INSULATE BARE EQUIPMENT | $7,000 | $500 | Implemented |
UW0016 # 05 Y:2008 | 05 | 2008 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $4,625 | $8,550 | Implemented |