IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,340

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0059 # 11 Y:1986 11 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $740 $655 Implemented
MA0044 # 01 Y:1985 01 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $760 $1,390 Implemented
MA0044 # 02 Y:1985 02 1985 INSTALL TIMERS AND/OR THERMOSTATS $1,253 $600 Implemented
MA0044 # 03 Y:1985 03 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $207 $200 Implemented
MA0044 # 04 Y:1985 04 1985 RECOVER WASTE HEAT FROM EQUIPMENT $3,311 $1,470 Implemented
MA0044 # 05 Y:1985 05 1985 HEAT WATER WITH EXHAUST HEAT $1,940 $1,466 Implemented
TN0254 # 01 Y:1985 01 1985 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $3,422 $1,042 Implemented
TN0254 # 02 Y:1985 02 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,886 $0 Implemented
TN0254 # 06 Y:1985 06 1985 USE MINIMUM STEAM OPERATING PRESSURE $595 $0 Implemented
TN0254 # 07 Y:1985 07 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $967 $225 Implemented
TN0254 # 08 Y:1985 08 1985 INSULATE BARE EQUIPMENT $197 $117 Implemented
UD0166 # 01 Y:1985 01 1985 RECOVER AND REUSE COOLING WATER $10,849 $7,160 Implemented
UD0166 # 02 Y:1985 02 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,600 $40,000 Implemented
UD0166 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,258 $50,000 Implemented
CO0028 # 01 Y:1985 01 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,738 $620 Implemented
CO0028 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,873 $150,000 Implemented
CO0028 # 03 Y:1985 03 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,370 $10,000 Implemented
CO0028 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $653 $300 Implemented
CO0028 # 05 Y:1985 05 1985 AIR CONDITION ONLY SPACE NECESSARY $264 $2,000 Implemented
CO0028 # 06 Y:1985 06 1985 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $2,158 $5,000 Implemented
CO0028 # 08 Y:1985 08 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,611 $1,140 Implemented
KU0156 # 02 Y:1985 02 1985 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $9,544 $3,342 Implemented
KU0156 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,064 $2,200 Implemented
KU0156 # 06 Y:1985 06 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $5,611 $1,200 Implemented
KU0156 # 07 Y:1985 07 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $6,298 $1,200 Implemented