IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

77

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0669 # 01 Y:2011 01 2011 REPLACE BOILER $28,774 $63,300 Implemented
MA0643 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,019 $3,800 Not Implemented
MA0643 # 04 Y:2009 04 2009 OPTIMIZE PLANT POWER FACTOR $6,439 $12,500 Implemented
MA0643 # 03 Y:2009 03 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,728 $18,400 Implemented
MA0643 # 02 Y:2009 02 2009 SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE $43,089 $6,000 Implemented
MA0643 # 01 Y:2009 01 2009 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $239,800 $170,000 Not Implemented
MA0475 # 08 Y:2000 08 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $130 $0 Implemented
MA0475 # 07 Y:2000 07 2000 INSTALL OCCUPANCY SENSORS $220 $500 Not Implemented
MA0475 # 06 Y:2000 06 2000 PAY BILLS ON TIME TO AVOID LATE FEES $519 $0 Implemented
MA0475 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $970 $150 Implemented
MA0475 # 04 Y:2000 04 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,950 $0 Implemented
MA0475 # 03 Y:2000 03 2000 INSTALL TIMERS AND/OR THERMOSTATS $2,000 $2,400 Implemented
MA0475 # 01 Y:2000 01 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,500 $8,500 Not Implemented
MA0475 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $2,450 $5,700 Implemented
MA0471 # 01 Y:2000 01 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $7,546 $18,500 Not Implemented
MA0471 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $114 $120 Implemented
MA0471 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,361 $19,740 Not Implemented
MA0471 # 04 Y:2000 04 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $1,548 $4,000 Not Implemented
MA0471 # 03 Y:2000 03 2000 INCREASE AMOUNT OF CONDENSATE RETURNED $2,804 $7,200 Not Implemented
MA0471 # 02 Y:2000 02 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $3,105 $11,000 Not Implemented
MA0445 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $353 $1,090 Implemented
MA0445 # 03 Y:1999 03 1999 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,546 $472 Implemented
MA0445 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $3,122 $7,125 Not Implemented
MA0445 # 01 Y:1999 01 1999 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $160,542 $811,250 Not Implemented
MA0323 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $346 $511 Not Implemented