IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

151

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0108 # 02 Y:2017 02 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,658 $290 Not Implemented
OR0599 # 05 Y:2012 05 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $1,964 $17,576 Not Implemented
OR0599 # 04 Y:2012 04 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,409 $0 Implemented
OR0599 # 03 Y:2012 03 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,422 $0 Not Implemented
OR0599 # 02 Y:2012 02 2012 INSTALL AUTOMATIC PACKING EQUIPMENT $35,308 $0 Implemented
OR0599 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,611 $12,467 Implemented
OR0493 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,900 $1,900 Not Implemented
OR0493 # 08 Y:2005 08 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,900 $17,000 Not Implemented
OR0493 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $2,400 $3,600 Not Implemented
OR0493 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,500 $0 Not Implemented
OR0493 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,400 $2,500 Not Implemented
OR0493 # 04 Y:2005 04 2005 USE OPTIMUM TEMPERATURE $11,000 $13,000 Not Implemented
OR0493 # 03 Y:2005 03 2005 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $5,400 $1,000 Not Implemented
OR0493 # 01 Y:2005 01 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $66,200 $1,000 Not Implemented
OR0387 # 02 Y:2001 02 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $440,800 $128,700 Implemented
OR0387 # 03 Y:2001 03 2001 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $324,800 $138,000 Not Implemented
OR0387 # 05 Y:2001 05 2001 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $57,000 $74,000 Implemented
OR0387 # 07 Y:2001 07 2001 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,400 $5,400 Not Implemented
OR0387 # 01 Y:2001 01 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $176,000 $5,000 Implemented
OR0387 # 06 Y:2001 06 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,800 $5,850 Implemented
OR0387 # 04 Y:2001 04 2001 UTILIZE A LESS EXPENSIVE COOLING METHOD $373,000 $580,000 Not Implemented
OR0387 # 09 Y:2001 09 2001 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $2,320 $0 Implemented
OR0387 # 08 Y:2001 08 2001 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,885 $300 Implemented
OR0385 # 06 Y:2000 06 2000 OPTIMIZE PLANT POWER FACTOR $670 $1,900 Not Implemented
OR0385 # 07 Y:2000 07 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,638 $10,431 Implemented