IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

218

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0192 # 08 Y:1996 08 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $461 $0 Not Implemented
ME0192 # 09 Y:1996 09 1996 MINIMIZE WATER USAGE $5,300 $550 Not Implemented
ME0192 # 10 Y:1996 10 1996 MINIMIZE WATER USAGE $2,657 $580 Not Implemented
ME0192 # 11 Y:1996 11 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,693 $3,100 Not Implemented
ME0192 # 12 Y:1996 12 1996 MINIMIZE WATER USAGE $1,139 $1,200 Not Implemented
AS0189 # 07 Y:1996 07 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $283 $0 Not Implemented
AS0189 # 10 Y:1996 10 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $96 $100 Implemented
AS0189 # 09 Y:1996 09 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,607 $26,161 Not Implemented
AS0189 # 08 Y:1996 08 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,148 $5,730 Not Implemented
AS0189 # 06 Y:1996 06 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,455 $3,500 Not Implemented
AS0189 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,795 $6,778 Not Implemented
AS0189 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $119 $115 Not Implemented
AS0189 # 03 Y:1996 03 1996 INSTALL TIMERS AND/OR THERMOSTATS $932 $2,080 Implemented
AS0189 # 02 Y:1996 02 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,466 $4,200 Implemented
AS0189 # 01 Y:1996 01 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,388 $10,000 Implemented
AM0281 # 02 Y:1996 02 1996 OPTIMIZE PLANT POWER FACTOR $14,320 $14,320 Not Implemented
AM0281 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $150 $180 Not Implemented
AM0281 # 07 Y:1996 07 1996 COMBINE UTILITY METERS $245 $0 Implemented
AM0281 # 06 Y:1996 06 1996 PAY UTILITY BILLS ON TIME $903 $0 Implemented
AM0281 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $950 $470 Implemented
AM0281 # 04 Y:1996 04 1996 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,250 $2,370 Implemented
AM0281 # 01 Y:1996 01 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $95,600 $1,500 Implemented
UL0166 # 02 Y:1996 02 1996 RECOVER AND REUSE WASTE MATERIAL $668 $0 Implemented
IA0150 # 04 Y:1996 04 1996 INSTALL OCCUPANCY SENSORS $350 $229 Implemented
IA0150 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $405 $1,186 Not Implemented