IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0450 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,775 $3,994 Implemented
AS0389 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,163 $1,698 Implemented
AS0389 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,971 $7,343 Implemented
AS0378 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,302 $480 Implemented
AS0378 # 07 Y:2004 07 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,906 $6,178 Implemented
AS0378 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,918 $12,008 Implemented
AS0378 # 04 Y:2004 04 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,081 $499 Implemented
AS0342 # 06 Y:2003 06 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $853 $0 Implemented
AS0189 # 01 Y:1996 01 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,388 $10,000 Implemented
AS0189 # 02 Y:1996 02 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,466 $4,200 Implemented
AS0189 # 03 Y:1996 03 1996 INSTALL TIMERS AND/OR THERMOSTATS $932 $2,080 Implemented
AS0189 # 10 Y:1996 10 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $96 $100 Implemented
AS0180 # 11 Y:1996 11 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,041 $1,780 Implemented
AS0180 # 10 Y:1996 10 1996 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $330 $30 Implemented
AS0180 # 09 Y:1996 09 1996 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,648 $30 Implemented
AS0180 # 06 Y:1996 06 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $63,244 $50,000 Implemented
AS0180 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,978 $14,977 Implemented
AS0098 # 02 Y:1993 02 1993 REPAIR AND ELIMINATE STEAM LEAKS $513 $1,050 Implemented
AS0098 # 03 Y:1993 03 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $209 $156 Implemented
AS0098 # 08 Y:1993 08 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $119 $0 Implemented
AS0098 # 07 Y:1993 07 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $65 $102 Implemented
AS0089 # 08 Y:1993 08 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $309 $400 Implemented
AS0089 # 07 Y:1993 07 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,523 $0 Implemented
AS0089 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,153 $653 Implemented
AS0089 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,082 $1,440 Implemented