Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
99
matching recommendationsSIC | 209 | Misc. Food And Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0126 # 01 Y:2017 | 01 | 2017 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $207,807 | $2,000,000 | Not Implemented |
UU0126 # 04 Y:2017 | 04 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,977 | $8,120 | Not Implemented |
UU0126 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,358 | $90 | Implemented |
UU0126 # 06 Y:2017 | 06 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,423 | $2,000 | Implemented |
UU0126 # 02 Y:2017 | 02 | 2017 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $27,838 | $3,980 | Implemented |
UU0126 # 03 Y:2017 | 03 | 2017 | REPLACE BOILER | $26,315 | $176,427 | Not Implemented |
LS0012 # 06 Y:2017 | 06 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $28,215 | $80,000 | Not Implemented |
LS0012 # 05 Y:2017 | 05 | 2017 | REDUCE EXCESSIVE BOILER BLOWDOWN | $3,685 | $4,250 | Not Implemented |
LS0012 # 04 Y:2017 | 04 | 2017 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $21,748 | $15,200 | Not Implemented |
LS0012 # 03 Y:2017 | 03 | 2017 | INSULATE BARE EQUIPMENT | $993 | $548 | Not Implemented |
LS0012 # 02 Y:2017 | 02 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,205 | $920 | Not Implemented |
LS0012 # 01 Y:2017 | 01 | 2017 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $28,766 | $12,000 | Not Implemented |
GT0908 # 01 Y:2017 | 01 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,412 | $125 | Implemented |
GT0908 # 03 Y:2017 | 03 | 2017 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $25,748 | $19,769 | Not Implemented |
GT0908 # 05 Y:2017 | 05 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,538 | $61,313 | Implemented |
GT0908 # 02 Y:2017 | 02 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,577 | $578 | Implemented |
GT0908 # 04 Y:2017 | 04 | 2017 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $30,382 | $47,492 | Not Implemented |
GT0908 # 06 Y:2017 | 06 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $44,491 | $135,000 | Implemented |
BS0108 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $443 | $1,238 | Not Implemented |
BS0108 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $104 | $165 | Not Implemented |
BS0108 # 02 Y:2017 | 02 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $3,658 | $290 | Not Implemented |
BS0108 # 01 Y:2017 | 01 | 2017 | OPTIMIZE PLANT POWER FACTOR | $6,587 | $25,166 | Not Implemented |
BS0108 # 06 Y:2017 | 06 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $240 | $270 | Not Implemented |
BS0108 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,696 | $1,050 | Not Implemented |
AM0737 # 05 Y:2017 | 05 | 2017 | OPTIMIZE PLANT POWER FACTOR | $4,070 | $6,200 | Not Implemented |