Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
54
matching recommendationsSIC | 2092 | Fresh Or Frozen Prepared Fish |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0043 # 10 Y:2014 | 10 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,014 | $1,242 | Not Implemented |
ORS005 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $23,531 | $41,296 | Implemented |
ORS005 # 02 Y:1999 | 02 | 1999 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $403,875 | $572,000 | Not Implemented |
ORS005 # 03 Y:1999 | 03 | 1999 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $55,755 | $0 | Implemented |
ORS005 # 04 Y:1999 | 04 | 1999 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $18,500 | $40,000 | Implemented |
ORS005 # 05 Y:1999 | 05 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,920 | $700 | Implemented |
ORS005 # 06 Y:1999 | 06 | 1999 | MOVE PRODUCT USING MECHANICAL MEANS | $97,200 | $11,600 | Not Implemented |
ORS005 # 07 Y:1999 | 07 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $350,000 | $570,000 | Not Implemented |
ORS005 # 08 Y:1999 | 08 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $139,000 | $280,000 | Not Implemented |
ORS005 # 09 Y:1999 | 09 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $310,000 | $69,000 | Implemented |
ORS005 # 10 Y:1999 | 10 | 1999 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $0 | $490 | Implemented |
ORS005 # 11 Y:1999 | 11 | 1999 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $1,489 | $6,220 | Not Implemented |
ORS003 # 05 Y:1999 | 05 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,140 | $700 | Implemented |
ORS003 # 01 Y:1999 | 01 | 1999 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $366,525 | $729,500 | Not Implemented |
ORS003 # 02 Y:1999 | 02 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,492 | $7,459 | Implemented |
ORS003 # 03 Y:1999 | 03 | 1999 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $39,677 | $20,000 | Implemented |
ORS003 # 09 Y:1999 | 09 | 1999 | INSTALL EQUIPMENT TO MOVE PRODUCT | $80,220 | $15,400 | Implemented |
ORS003 # 08 Y:1999 | 08 | 1999 | USE OTHER WASTE CONCENTRATION METHODS | $39,020 | $34,600 | Implemented |
ORS003 # 07 Y:1999 | 07 | 1999 | MINIMIZE WATER USAGE | $-1,640 | $4,000 | Not Implemented |
ORS003 # 06 Y:1999 | 06 | 1999 | INCREASE AMOUNT OF CONDENSATE RETURNED | $1,420 | $2,000 | Not Implemented |
ORS003 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,755 | $20,400 | Not Implemented |
ORS002 # 08 Y:1999 | 08 | 1999 | REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING | $5,954 | $0 | Implemented |
ORS002 # 07 Y:1999 | 07 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $67,400 | $200,000 | Not Implemented |
ORS002 # 06 Y:1999 | 06 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $90,560 | $64,000 | Not Implemented |
ORS002 # 05 Y:1999 | 05 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $166,000 | $121,000 | Implemented |