IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 2092 Fresh Or Frozen Prepared Fish
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0761 # 05 Y:2016 05 2016 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $864 $342 Not Implemented
MA0761 # 04 Y:2016 04 2016 MINIMIZE WATER USAGE $3,035 $4,050 Not Implemented
MA0761 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,889 $2,685 Not Implemented
MA0761 # 01 Y:2016 01 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $22,997 $134,000 Not Implemented
MA0761 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,969 $6,409 Not Implemented
MA0761 # 06 Y:2016 06 2016 OPTIMIZE PLANT POWER FACTOR $816 $2,000 Not Implemented
MA0669 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $410 $550 Implemented
MA0669 # 06 Y:2011 06 2011 INSULATE BARE EQUIPMENT $736 $349 Not Implemented
MA0669 # 05 Y:2011 05 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,576 $25,250 Not Implemented
MA0669 # 04 Y:2011 04 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $7,848 $1,500 Implemented
MA0669 # 03 Y:2011 03 2011 OPTIMIZE PLANT POWER FACTOR $10,179 $11,190 Implemented
MA0669 # 02 Y:2011 02 2011 INSULATE BARE EQUIPMENT $12,439 $25,000 Not Implemented
MA0669 # 01 Y:2011 01 2011 REPLACE BOILER $28,774 $63,300 Implemented
MA0475 # 03 Y:2000 03 2000 INSTALL TIMERS AND/OR THERMOSTATS $2,000 $2,400 Implemented
MA0475 # 04 Y:2000 04 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,950 $0 Implemented
MA0475 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $970 $150 Implemented
MA0475 # 06 Y:2000 06 2000 $519 $0 Implemented
MA0475 # 07 Y:2000 07 2000 INSTALL OCCUPANCY SENSORS $220 $500 Not Implemented
MA0475 # 08 Y:2000 08 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $130 $0 Implemented
MA0475 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $2,450 $5,700 Implemented
MA0475 # 01 Y:2000 01 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,500 $8,500 Not Implemented
MA0471 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $114 $120 Implemented
MA0471 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,361 $19,740 Not Implemented
MA0471 # 04 Y:2000 04 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $1,548 $4,000 Not Implemented
MA0471 # 02 Y:2000 02 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $3,105 $11,000 Not Implemented