Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsSIC | 2092 | Fresh Or Frozen Prepared Fish |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0661 # 02 Y:2015 | 02 | 2015 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $76,637 | $205,256 | Not Implemented |
OR0661 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,783 | $2,340 | Not Implemented |
OR0661 # 04 Y:2015 | 04 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $10,575 | $3,600 | Not Implemented |
OR0661 # 03 Y:2015 | 03 | 2015 | INSULATE BARE EQUIPMENT | $1,989 | $170 | Implemented |
OR0661 # 01 Y:2015 | 01 | 2015 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $52,251 | $18,807 | Implemented |
OR0660 # 04 Y:2015 | 04 | 2015 | USE SOLAR HEAT TO MAKE ELECTRICTY | $8,242 | $54,525 | Not Implemented |
OR0660 # 01 Y:2015 | 01 | 2015 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $135,000 | $250,000 | Implemented |
OR0660 # 02 Y:2015 | 02 | 2015 | INSTALL OCCUPANCY SENSORS | $3,310 | $8,500 | Implemented |
OR0660 # 03 Y:2015 | 03 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,283 | $1,500 | Implemented |
OR0654 # 06 Y:2015 | 06 | 2015 | USE SOLAR HEAT TO MAKE ELECTRICTY | $2,026 | $9,325 | Implemented |
OR0654 # 01 Y:2015 | 01 | 2015 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,067,158 | $300,000 | Implemented |
OR0654 # 05 Y:2015 | 05 | 2015 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $6,722 | $60,000 | Not Implemented |
OR0654 # 02 Y:2015 | 02 | 2015 | MODIFY WORKLOAD | $23,248 | $10,000 | Implemented |
OR0654 # 04 Y:2015 | 04 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,588 | $5,986 | Implemented |
OR0654 # 03 Y:2015 | 03 | 2015 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $115,650 | $50,000 | Implemented |
OR0614 # 01 Y:2013 | 01 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $31,637 | $42,000 | Not Implemented |
OR0614 # 02 Y:2013 | 02 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $16,101 | $10,000 | Implemented |
OR0614 # 03 Y:2013 | 03 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,327 | $0 | Implemented |
OR0614 # 04 Y:2013 | 04 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,554 | $1,828 | Not Implemented |
OR0614 # 05 Y:2013 | 05 | 2013 | INSULATE BARE EQUIPMENT | $667 | $446 | Not Implemented |
OR0354 # 01 Y:1999 | 01 | 1999 | CLOSE OFF UNNEEDED STEAM LINES | $5,250 | $950 | Implemented |
OR0354 # 02 Y:1999 | 02 | 1999 | USE MINIMUM STEAM OPERATING PRESSURE | $560 | $0 | Not Implemented |
OR0354 # 03 Y:1999 | 03 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $750 | $500 | Implemented |
OR0354 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $661 | $2,049 | Implemented |
OR0354 # 05 Y:1999 | 05 | 1999 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $950 | $0 | Not Implemented |