Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
58
matching recommendationsSIC | 2092 | Fresh Or Frozen Prepared Fish |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OD0150 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $370 | $400 | Not Implemented |
OD0150 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $402 | $20 | Not Implemented |
OD0150 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $611 | $3,660 | Not Implemented |
OD0150 # 05 Y:1999 | 05 | 1999 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $779 | $0 | Not Implemented |
OD0150 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,354 | $9,564 | Not Implemented |
OR0359 # 04 Y:1999 | 04 | 1999 | OPTIMIZE PLANT POWER FACTOR | $786 | $2,200 | Not Implemented |
OR0359 # 03 Y:1999 | 03 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,648 | $9,500 | Not Implemented |
OR0359 # 02 Y:1999 | 02 | 1999 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,013 | $0 | Implemented |
OR0359 # 01 Y:1999 | 01 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $80,000 | $95,000 | Not Implemented |
OR0359 # 05 Y:1999 | 05 | 1999 | COMBINE UTILITY METERS | $1,851 | $10,000 | Not Implemented |
OR0358 # 04 Y:1999 | 04 | 1999 | ELIMINATE A BY-PRODUCT | $9,905 | $2,000 | Implemented |
OR0358 # 01 Y:1999 | 01 | 1999 | OPTIMIZE PLANT POWER FACTOR | $0 | $3,600 | Not Implemented |
OR0358 # 02 Y:1999 | 02 | 1999 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $2,574 | $12,750 | Not Implemented |
OR0358 # 03 Y:1999 | 03 | 1999 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $860 | $17,000 | Not Implemented |
OR0357 # 01 Y:1999 | 01 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $423,000 | $140,000 | Not Implemented |
OR0357 # 02 Y:1999 | 02 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $91,000 | $95,000 | Not Implemented |
OR0357 # 03 Y:1999 | 03 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $2,800 | $7,000 | Not Implemented |
OR0357 # 04 Y:1999 | 04 | 1999 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $198,470 | $500,000 | Not Implemented |
OR0357 # 05 Y:1999 | 05 | 1999 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $7,150 | $0 | Implemented |
OR0357 # 06 Y:1999 | 06 | 1999 | OPTIMIZE PLANT POWER FACTOR | $1,621 | $4,800 | Implemented |
ORS005 # 11 Y:1999 | 11 | 1999 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $1,489 | $6,220 | Not Implemented |
ORS005 # 05 Y:1999 | 05 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,920 | $700 | Implemented |
ORS005 # 02 Y:1999 | 02 | 1999 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $403,875 | $572,000 | Not Implemented |
ORS005 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $23,531 | $41,296 | Implemented |
ORS005 # 04 Y:1999 | 04 | 1999 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $18,500 | $40,000 | Implemented |