IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0593 # 01 Y:2006 01 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,910 $60,580 Not Implemented
CO0593 # 02 Y:2006 02 2006 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $6,180 $60 Implemented
CO0593 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,750 $120 Implemented
CO0593 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,190 $1,402 Not Implemented
CO0593 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,790 $6,950 Not Implemented
CO0593 # 06 Y:2006 06 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $3,030 $1,920 Not Implemented
CO0593 # 07 Y:2006 07 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,550 $6,000 Implemented
AM0511 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $3,600 $2,440 Not Implemented
AM0511 # 03 Y:2006 03 2006 USE SYNTHETIC LUBRICANT $2,665 $0 Not Implemented
AM0511 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,170 $640 Not Implemented
AM0511 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,160 $150 Implemented
AM0511 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,150 $15 Not Implemented
AM0511 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $18,600 $59,000 Implemented
UU0101 # 01 Y:2006 01 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,190 $10,000 Not Implemented
UU0101 # 06 Y:2006 06 2006 $100,330 $52,800 Not Implemented
UU0101 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $3,770 $4,140 Not Implemented
UU0101 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,760 $10,030 Not Implemented
UU0101 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,230 $3,050 Not Implemented
UU0101 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,280 $4,150 Not Implemented
WI0506 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,973 $16,740 Implemented
WI0506 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $1,049 $0 Implemented
WI0506 # 03 Y:2006 03 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,464 $0 Not Implemented
WI0506 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,464 $1,000 Implemented
WI0506 # 05 Y:2006 05 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,795 $800 Implemented
WI0506 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,430 $0 Implemented