Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,953
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CM1017 # 07 Y:2023 | 07 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,464 | $3,500 | Implemented |
CM1017 # 05 Y:2023 | 05 | 2023 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $1,538 | $4,396 | Implemented |
CM1017 # 03 Y:2023 | 03 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $1,890 | $15,750 | Implemented |
UW2301 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $82 | $344 | Implemented |
UW2301 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,523 | $16,133 | Implemented |
KS2310 # 06 Y:2023 | 06 | 2023 | UPGRADE OBSOLETE EQUIPMENT | $8,217 | $52,431 | Implemented |
KS2310 # 01 Y:2023 | 01 | 2023 | USE OPTIMUM THICKNESS INSULATION | $6,101 | $3,005 | Implemented |
UL2210 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,273 | $11,544 | Implemented |
UL2210 # 02 Y:2022 | 02 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,394 | $0 | Implemented |
UL2210 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,208 | $0 | Implemented |
UL2210 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,235 | $1,600 | Implemented |
KS2203 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,941 | $13,595 | Implemented |
KS2203 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,676 | $45 | Implemented |
KS2203 # 04 Y:2022 | 04 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $98,216 | $570,000 | Implemented |
KS2203 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,656 | $5,480 | Implemented |
KS2203 # 01 Y:2022 | 01 | 2022 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,958 | $5,101 | Implemented |
KS2203 # 02 Y:2022 | 02 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,131 | $0 | Implemented |
KS2202 # 08 Y:2022 | 08 | 2022 | INSTALL OCCUPANCY SENSORS | $1,832 | $7,155 | Implemented |
KS2202 # 04 Y:2022 | 04 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,104 | $45 | Implemented |
KS2202 # 06 Y:2022 | 06 | 2022 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $2,883 | $4,387 | Implemented |
KS2202 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,798 | $10,051 | Implemented |
KS2202 # 10 Y:2022 | 10 | 2022 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $270 | $490 | Implemented |
KS2202 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,120 | $5,480 | Implemented |
WV0624 # 17 Y:2022 | 17 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $368 | $725 | Implemented |
WV0624 # 06 Y:2022 | 06 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $33,682 | $7,000 | Implemented |