IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,938

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0112 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $2,827 $2,088 Implemented
SU0112 # 06 Y:2001 06 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,560 $120,000 Implemented
LE0107 # 01 Y:2001 01 2001 IMPROVE LUBRICATION PRACTICES $272 $200 Implemented
LE0107 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $639 $0 Implemented
LE0107 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $304 $0 Implemented
LE0107 # 06 Y:2001 06 2001 USE OPTIMUM THICKNESS INSULATION $246 $350 Implemented
GT0708 # 01 Y:2001 01 2001 MOVE BOILER TO MORE EFFICIENT LOCATION $7,140 $0 Implemented
GT0708 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,765 $0 Implemented
GT0708 # 04 Y:2001 04 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $38,843 $13,500 Implemented
GT0708 # 06 Y:2001 06 2001 REPAIR OR REPLACE STEAM TRAPS $9,164 $10,500 Implemented
GT0708 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,650 $21,400 Implemented
NC0209 # 02 Y:2001 02 2001 UPGRADE CONTROLS ON COMPRESSORS $2,519 $5,600 Implemented
NC0209 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $163 $200 Implemented
NC0209 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,886 $2,360 Implemented
GT0704 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,348 $11,544 Implemented
GT0704 # 05 Y:2000 05 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $30,230 $43,056 Implemented
GT0704 # 07 Y:2000 07 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,499 $78,601 Implemented
GT0705 # 03 Y:2000 03 2000 MINIMIZE WATER USAGE $1,457 $300 Implemented
GT0705 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,420 $0 Implemented
OD0172 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $89,664 $154,663 Implemented
OD0172 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,087 $1,800 Implemented
NC0202 # 01 Y:2000 01 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,541 $7,971 Implemented
NC0202 # 02 Y:2000 02 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,464 $865 Implemented
NC0202 # 03 Y:2000 03 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,647 $0 Implemented
NC0202 # 06 Y:2000 06 2000 RECOVER AND REUSE COOLING WATER $2,950 $2,000 Implemented