Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
24
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0742 # 02 Y:2015 | 02 | 2015 | OPTIMIZE PLANT POWER FACTOR | $38,357 | $25,972 | Implemented |
MA0742 # 03 Y:2015 | 03 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $24,583 | $5,560 | Implemented |
MA0742 # 05 Y:2015 | 05 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,116 | $9,000 | Implemented |
MA0742 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,465 | $11,685 | Implemented |
MA0742 # 08 Y:2015 | 08 | 2015 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,024 | $11,650 | Implemented |
ME0269 # 15 Y:1999 | 15 | 1999 | MINIMIZE WATER USAGE | $229 | $100 | Implemented |
ME0269 # 13 Y:1999 | 13 | 1999 | INSULATE BARE EQUIPMENT | $547 | $273 | Implemented |
ME0269 # 12 Y:1999 | 12 | 1999 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,273 | $1,632 | Implemented |
ME0269 # 10 Y:1999 | 10 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,179 | $2,000 | Implemented |
ME0269 # 08 Y:1999 | 08 | 1999 | INSULATE BARE EQUIPMENT | $4,461 | $650 | Implemented |
ME0269 # 07 Y:1999 | 07 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,202 | $10,069 | Implemented |
ME0269 # 06 Y:1999 | 06 | 1999 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $6,530 | $21,460 | Implemented |
ME0269 # 05 Y:1999 | 05 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,299 | $10,600 | Implemented |
ME0269 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,324 | $1,000 | Implemented |
ME0269 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,778 | $56,288 | Implemented |
MA0224 # 08 Y:1991 | 08 | 1991 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,542 | $1,060 | Implemented |
MA0224 # 07 Y:1991 | 07 | 1991 | INSULATE BARE EQUIPMENT | $1,859 | $2,250 | Implemented |
MA0224 # 05 Y:1991 | 05 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,079 | $16,200 | Implemented |
MA0224 # 04 Y:1991 | 04 | 1991 | REPAIR OR REPLACE STEAM TRAPS | $21,213 | $35,000 | Implemented |
MA0117 # 05 Y:1988 | 05 | 1988 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $340 | $0 | Implemented |
MA0117 # 04 Y:1988 | 04 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $240 | $75 | Implemented |
MA0117 # 02 Y:1988 | 02 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $625 | $105 | Implemented |
MA0032 # 07 Y:1985 | 07 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $485 | $120 | Implemented |
MA0032 # 06 Y:1985 | 06 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,902 | $2,400 | Implemented |