IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,239

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0603 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,643 $50,038 Implemented
NC0603 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $40 $100 Implemented
NC0603 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,607 $500 Implemented
NC0603 # 04 Y:2017 04 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $74 $240 Not Implemented
NC0603 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,221 $100 Not Implemented
NC0603 # 06 Y:2017 06 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $21,836 $50 Implemented
NC0603 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $64,413 $100,000 Not Implemented
NC0603 # 08 Y:2017 08 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $19,341 $30,000 Implemented
NC0595 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,435 $144,553 Not Implemented
NC0595 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $896 $100 Implemented
NC0595 # 03 Y:2017 03 2017 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $375 $552 Implemented
NC0595 # 04 Y:2017 04 2017 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $3,516 $400 Implemented
NC0595 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $910 $2,000 Not Implemented
GT0900 # 01 Y:2017 01 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,820 $250 Implemented
GT0900 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,671 $250 Implemented
GT0900 # 03 Y:2017 03 2017 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,890 $180 Implemented
GT0900 # 04 Y:2017 04 2017 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $42,468 $8,000 Not Implemented
GT0900 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,980 $127,113 Implemented
GT0900 # 06 Y:2017 06 2017 INSULATE BARE EQUIPMENT $16,527 $106,785 Not Implemented
SD0550 # 01 Y:2017 01 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $526,998 $1,348,560 Not Implemented
SD0550 # 02 Y:2017 02 2017 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $119,615 $210,000 Implemented
SD0550 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,225 $2,500 Implemented
SD0550 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,945 $600 Not Implemented
SD0550 # 05 Y:2017 05 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,077 $9,750 Not Implemented
NC0589 # 01 Y:2017 01 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,378 $62,575 Not Implemented