IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,239

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0440 # 05 Y:2011 05 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,312 $8,420 Implemented
TT0078 # 05 Y:2011 05 2011 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $15,241 $12,500 Not Implemented
TT0078 # 01 Y:2011 01 2011 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $8,585 $29,500 Not Implemented
TT0078 # 02 Y:2011 02 2011 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $10,364 $5,531 Not Implemented
TT0078 # 03 Y:2011 03 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,023 $1,480 Implemented
TT0078 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,720 $800 Implemented
UA0066 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,215 $62,771 Implemented
UA0066 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $2,224 $4,767 Not Implemented
UA0066 # 03 Y:2011 03 2011 UPGRADE CONTROLS ON COMPRESSORS $22,864 $30,000 Implemented
UA0066 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,677 $640 Implemented
UA0066 # 05 Y:2011 05 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $22,848 $11,400 Implemented
UA0066 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $98,887 $13,568 Implemented
UA0066 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $100,439 $14,349 Not Implemented
UA0066 # 08 Y:2011 08 2011 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $26,728 $64,000 Not Implemented
UA0066 # 09 Y:2011 09 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $3,013 $1,266 Not Implemented
UA0066 # 10 Y:2011 10 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,963 $3,900 Implemented
GT0883 # 01 Y:2011 01 2011 INSULATE BARE EQUIPMENT $1,910 $242 n/a
GT0883 # 02 Y:2011 02 2011 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,435 $800 n/a
GT0883 # 03 Y:2011 03 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,504 $36,650 n/a
GT0883 # 04 Y:2011 04 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $34,385 $107,085 n/a
GT0883 # 05 Y:2011 05 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,404 $46,133 n/a
GT0883 # 06 Y:2011 06 2011 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $42,689 $368,265 n/a
GT0883 # 07 Y:2011 07 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $10,194 $7,000 n/a
UD0838 # 01 Y:2011 01 2011 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $9,635 $15,000 Not Implemented
UD0838 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,095 $55,000 Not Implemented