IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,201

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0018 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,809 $22,423 Implemented
TT0018 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,637 $5,950 Implemented
GT0846 # 01 Y:2008 01 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $61,777 $40,000 Implemented
GT0846 # 02 Y:2008 02 2008 USE MINIMUM STEAM OPERATING PRESSURE $16,146 $15,536 Implemented
GT0846 # 03 Y:2008 03 2008 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $830 $1,094 Not Implemented
GT0846 # 04 Y:2008 04 2008 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $17,989 $26,900 Not Implemented
GT0846 # 05 Y:2008 05 2008 HEAT WATER WITH EXHAUST HEAT $551,313 $130,000 Not Implemented
GT0846 # 06 Y:2008 06 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $59,040 $65,000 Implemented
GT0846 # 07 Y:2008 07 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $155,720 $30,000 Implemented
GT0846 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,504 $70,103 Implemented
GT0846 # 09 Y:2008 09 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,206 $35,000 Not Implemented
IA0416 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,435 $1,000 Implemented
IA0416 # 02 Y:2007 02 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,998 $268 Implemented
IA0416 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,605 $17 Implemented
IA0416 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,598 $17,058 Implemented
IA0416 # 05 Y:2007 05 2007 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,251 $1,500 Not Implemented
IA0416 # 06 Y:2007 06 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,314 $36,000 Not Implemented
IA0416 # 07 Y:2007 07 2007 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $25,453 $36,600 Implemented
IA0416 # 08 Y:2007 08 2007 INSTALL OCCUPANCY SENSORS $1,065 $1,694 Implemented
IA0416 # 09 Y:2007 09 2007 INSULATE BARE EQUIPMENT $6,665 $1,610 Implemented
IA0416 # 10 Y:2007 10 2007 INSULATE BARE EQUIPMENT $9,900 $3,800 Implemented
GT0844 # 01 Y:2007 01 2007 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $19,992 $28,800 Not Implemented
GT0844 # 02 Y:2007 02 2007 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $35,650 $40,000 Not Implemented
GT0844 # 03 Y:2007 03 2007 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $71,952 $14,867 Not Implemented
GT0844 # 04 Y:2007 04 2007 REDUCE EXCESSIVE BOILER BLOWDOWN $44,955 $10,000 Not Implemented