IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,239

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0842 # 03 Y:2007 03 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,060 $26,800 Not Implemented
GT0842 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $76,200 $20,000 Not Implemented
GT0842 # 05 Y:2007 05 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,090 $3,900 Implemented
GT0842 # 06 Y:2007 06 2007 USE WATER-BASED ADHESIVES $1,960 $0 Implemented
GT0842 # 07 Y:2007 07 2007 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $63,520 $7,000 Implemented
GT0842 # 08 Y:2007 08 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,470 $11,100 Not Implemented
MZ0015 # 01 Y:2007 01 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,790 $900 Implemented
MZ0015 # 02 Y:2007 02 2007 INSTALL OCCUPANCY SENSORS $376 $180 Implemented
MZ0015 # 03 Y:2007 03 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,109 $0 Not Implemented
MZ0014 # 01 Y:2007 01 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $240 $1,020 Implemented
MZ0014 # 02 Y:2007 02 2007 INSTALL OCCUPANCY SENSORS $73 $180 Not Implemented
MZ0014 # 03 Y:2007 03 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $157 $0 Implemented
GT0838 # 01 Y:2007 01 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $25,825 $10,000 Not Implemented
GT0838 # 02 Y:2007 02 2007 USE MINIMUM SAFE OVEN VENTILATION $5,955 $6,000 Not Implemented
GT0838 # 03 Y:2007 03 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $7,976 $0 Not Implemented
GT0838 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,908 $0 Not Implemented
GT0838 # 05 Y:2007 05 2007 USE MINIMUM STEAM OPERATING PRESSURE $17,020 $0 Not Implemented
GT0838 # 06 Y:2007 06 2007 REDUCE EXCESSIVE BOILER BLOWDOWN $1,288 $3,975 Not Implemented
GT0838 # 07 Y:2007 07 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,338 $2,250 Not Implemented
GT0838 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,896 $127,725 Not Implemented
GT0838 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,159 $17,436 Not Implemented
GT0838 # 10 Y:2007 10 2007 INSULATE BARE EQUIPMENT $2,340 $2,004 Not Implemented
LL0278 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,656 $10,860 Implemented
LL0278 # 02 Y:2007 02 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $14,779 $1,384 Not Implemented
LL0278 # 03 Y:2007 03 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $9,981 $150 Implemented